Skip to main content
Construction Project Control Software

Your Projects Run On WhatsApp. Control Should Too.

Velora reads your WhatsApp chats, voice notes, photos, and site documents — and cross-checks them against your plan, work orders, and bills to surface what's on track, what's at risk, and what needs action.

Schedule — Commitments, progress, and blockers tracked to closure.
Cost — Completions, deliveries, and bills verified before payment.
Quality — Inspections tracked to closure, not rediscovered at handoffs.
Reports — DPR, DLR, and bill summaries auto-drafted.
Show Me on My Data

Share 1 active group chat export — we show you what Velora finds.

Tower B · SiteRavi, John, Greg +5
Ravi
0:14

आठ मेसन, पाँच हेल्पर — टावर B पर

07:45 ✓✓
John

380 bags · Kalindi. GRN signed.

photo
10:42 ✓✓
Greg

Tower B 3F slab pour complete ✓

photo
15:30 ✓✓
Suresh (Client)

Add beam at C4 grid 3F. Confirm.

14:22 ✓✓
ScheduleTower B · Wk 26
MTWTF
3F Slab
Done
3F Inspect
+2d
B·4F
Blocked
OrdersERP
WO #23Tower B 3F Slab · 1,800 sqm · ₹5.13L
MO #401Kalindi Cements · 420 bags · Due today
Meas. BookMB #12
ParticularsNoLBD/HQty
3F Slab – Main154.030.01,620
Total (sqm)1,620
BillPDFBill #8
Sharma Constructions
3F Slab · 1,850 sqm @ ₹250₹4.62L
Shuttering · 1,850 sqm @ ₹35₹65K
Total Claimed₹5.27L
Work OrdersMaterial OrdersMeas. BooksInvoices
Velora
Commitment ClosedClosed on time

Karanvir: shuttering done 10 AM · 3 sets on site

Schedule
WhatsApp
Work Order Completion ConfirmedAll clear

3F pour done · MB: 1,620 sqm · Photo linked to WO

CostQuality
WO #23MB #12WhatsApp
No Update for Planned ActivityFollow Up

Electrical rough-in · Tower B 3F scheduled to start today · No WhatsApp update from site · 5 hrs elapsed

Schedule
WhatsAppWO #25
Delivery Difference40 bags · Follow Up

420 bags ordered · 380 delivered · 40 bags pending

Cost
MO #401WhatsApp
Attendance Difference₹47K · Verify

Log: 13 workers · Bill for 18 · 5 difference

Cost
WhatsAppBill #8
Blocker Detected2 days · Action Needed

Tower B 4F work cannot start · 3F inspection sign-off pending · 2 days overdue

Schedule
WO #23WhatsApp

Voices from the field

Fit-out to Infra. Same Story.

Promised in the meeting. Vanished after.

The firm's single biggest bottleneck is commitment disappearance — promises made but never tracked, verified, and closed.
Firm PrincipalArchitecture, Design & Construction

In all site groups, still blind

I'm on WhatsApp groups for every site. I still can't tell, who was behind on what this week. Unable to hold my subs to deadlines effectively.
Business OwnerConstruction & Warehousing

Bill raised. Collating evidence to verify.

Subs share measurements, photos and voice notes on WhatsApp. I need those matched to the work order and bill — so we can verify before payment.
Pre-fab ContractorResidential GC

Issue #47 in group 7 of 19 - notified 6 hours late.

Someone flags a problem in one group. I'm across nineteen. Noticed 6 hours late. Only if I had all blockers across groups collated in one place.
Senior Project ManagerResidential & Commercial GC

Splurged on apps — rolled back

We deployed a mobile app to track 5 infra projects. No one on the field used them. Everyone was back on WhatsApp within 2 weeks.
Project Management Consultant (PMC)Government Infra Projects

Why project control breaks down

The data exists. It's just fragmented.

Updates get shared. Deliveries are noted. Commitments are made. They just live across WhatsApp groups, spreadsheets, PDFs, and the ERP — and nobody reconciles them.

Schedule

Progress. Commitments. Blockers. None tracked.

A work front stops. The sand delivery committed for Thursday hasn't arrived — buried six days back in 300 messages of photos, voice notes, and updates from other fronts.

The delay is three days old, cascading into other trades. You are scrolling to find out who missed.

Cost

Deliveries noted. Work done. Bill arrives. Nothing reconciled.

A cement truck arrives. 'Received ✓' goes into the group and the chat moves on. Store manager logged delivery in excel.

Three weeks later the bill arrives: 430 bags billed, 380 per excel — 50 bags nobody chased. You are scrambling to dispute the bill.

Quality

Defects. Safety. Inspections. Neither reaches closure.

A non-conformance is raised — waterproofing not to spec on Level 3. Sub says they'll fix it. Chat moves on.

Three weeks later, same defect at handoff. Sub says it's done — your only record is buried 400 messages deep, half of it voice notes. A two-hour fix is now a disputed delay.

Every slip, overrun, and defect left a trail. It's just split across chats, spreadsheets, and documents that were never meant to talk to each other.

What changes

What changes when project control runs where the work lives.

Without Velora
With Velora
Schedule
Progress picture assembled from 9 group scrolls every morning — variances surface too late
Progress structured automatically — plan vs actuals, variances flagged as they build
Blockers flagged in groups — no tracking, no follow-up, no closure
Blockers extracted, assigned, tracked to closure without manual chasing
Cost
Material deliveries acknowledged but never reconciled — invoice arrives and you're scrolling
Every delivery note tracked, mapped against order rates — controlled before the invoice
Work completion evidence scattered between measurement books & photos — compiled manually before payment
Evidence captured at completion, attached to work order, ready for payment approval
Scope changed in chat — no change order raised, no cost impact tracked, leakage discovered at billing
Scope changes detected from chats, verified against approved change orders before costs slip
Labour attendance compiled manually from multiple group messages
Attendance compiled automatically — ready for payroll and manpower reports
Quality
Inspections requested in chat — manual tracking, manual chasing, no closure
Inspections & Quality checks logged, assigned, tracked to closure
Non-conformances flagged in chat — rediscovered at handoff as delays
Non-conformances captured, tracked, resolved before handoff

Construction managers have tried PM software. Most teams went back to WhatsApp in two weeks.

PM software asks site teams to adopt a new tool — they default back to WhatsApp because it's faster and already on every phone. Spreadsheets require someone to remember to update them — they fall behind the moment a delivery happens at 6pm and gets logged the next morning, if at all.

Velora doesn't ask for either. It reads what your teams are already sending on WhatsApp, and cross-checks them against the Excel trackers and PDFs you have — finding where they disagree, on schedule, cost, or quality, before that gap compounds into something you can't recover.

No new app. No new habit. No spreadsheet someone has to remember to fill.

Who This Is For

Built for the construction manager accountable for delivery

Schedule, cost, and quality accountability lands on one person — whether in a 5-person fit-out firm or a large GC managing infra packages. The title differs. The daily challenges don't.

Works across

Infra
Residential
Commercial
Commercial fit out
Industrial erection
Steel structures
Modular
Prefabricated
Containerized buildings
Manufactured homes
Solar installation
Telecom rollout

Project Managers & Site Engineers

You're accountable for schedule, cost, and quality — but the picture is spread across chats, measurement books, and documents every morning.

  • Progress and blockers buried across groups — variance builds before you see it
  • Inspections and non-conformances flagged in chat — never tracked, never closed
  • Deliveries acknowledged but never reconciled — cost leakage invisible until the invoice
  • Work order evidence scattered in measurements, photos and voice notes — unstructured, unactionable
  • Scope changes agreed in chat — no change order raised, sub bills revised scope, no basis to verify
  • DPR takes 45 minutes every morning — time spent reporting instead of managing

Velora reads the groups and structures what happened — so you spend the morning managing, not reconstructing.

Construction Business Owners

You run multiple projects — trying to see where margin is leaking before it shows up in the final bill.

  • Issues sit unescalated in chats & commitments get missed — delays compound before you find out
  • Invoices arrive inflated — deliveries never logged, consumption never tracked, nothing to dispute
  • Completion sign-offs verified manually from chat — multiple subs, multiple sites, every week
  • Scope changes absorbed silently across sites — no formal record, margin gone before you're told
  • One underperforming site drags the portfolio — your first signal is usually a call from the manager
  • No consistent view across projects — just a phone chain to each PM every morning

Velora gives you a consistent view across all sites — margin leaks flagged before they become numbers you're absorbing.

PMCs & Outsourced Project Managers

You're contracted to deliver — but your visibility is limited to site visits and WhatsApp threads.

  • 3–8 projects, each team in a different group — no consistent format, no shared structure
  • Client reports compiled manually from chat history and calls — every week
  • Issues flagged in chat — no structured closure trail to show the client you followed through
  • Variances visible in messages — by the time you visit, the delay has already compounded
  • Scope changes negotiated in chat — no formal trail when certifying the bill or defending cost
  • Proving your value requires structured documentation — what you have is a thread of messages and a Friday afternoon

Velora gives you a structured trail across every project — client-ready, without the Friday scramble.

How it works

Four Steps. Zero Change for Your Teams.

Add Velora to your existing groups and upload your documents. Your teams keep working exactly as they do. You get project control from what's already shared.

01
Capture

Captures every update your teams already send

Connect Velora to your existing WhatsApp groups. Messages, voice notes, photos — captured as they happen.

02
Extract

Every update is structured automatically

Progress, blockers, commitments, deliveries, attendance, scope changes — all structured automatically.

03
Analyze

Variances and blockers surfaced immediately

Plan vs actual tracked. Scope changes detected. Issues and action items followed through to closure.

04
Reconcile

Cross-referenced against your documents

Deliveries matched to orders. Completions verified against measurements. Bills checked before payment.

Data Sources

WhatsApp Messages
Voice Notes
Photos & Scans
Project Schedule
PDFs & Documents
Excel / CSV

Involved Parties

GCSubcontractorsClientsHead Office
Velora

Velora AI

Capture
Extract
Analyze
Reconcile

What You Get

Progress tracked against plan daily
Blockers escalated before they compound
Inspections logged, NCs followed through
Deliveries reconciled against orders
Scope changes flagged, CO raised
Bills verified before you pay

What Velora Delivers

Schedule, cost, and quality control — right from how your teams already operate.

Dashboard

Schedule + Cost + Quality

All work fronts — health, progress and blockers.

Every work front summarised with a health status, progress against targets, blockers & commitments — structured from your group messages. No collating every morning.

Execution

Schedule + Quality

Progress vs targets, issues, inspections, and actions.

Materials

Cost

Deliveries matched to orders. Procurement bills verified.

Work Orders

Schedule + Cost + Quality

Completion evidence and sign-offs — payment-ready.

Crews

Cost

Attendance compiled automatically. Payroll verified.

Equipment

Cost

Utilisation notes tracked. Idle days flagged.

Change Orders

Cost

Scope changes flagged against COs — before billing.

Billing

Cost

Bills verified against deliveries. Mismatches flagged.

Reports

Schedule

DPR, DLR, payroll, and bill summaries — auto-drafted.

Platform

QR codes, multi-lingual, voice notes — no new apps.

Project · Site View
Sunridge Phase II
At Risk
Live
Billing
₹18.4L
8 bills · 72% verified
1 mismatch found
Materials
₹9.2L
12 MOs · 68% delivered
2 stock flags
Change Orders
₹2.1L
3 COs · 67% approved
2 scope changes unlinked
Work Front Health
6
1 at risk · 2 behind · 3 on track
Status
Blockers
5
3 blocking · 2 hold points
Type
Overdue
6
3 issues · 2 late starts · 1 action
Breakdown
Schedule Targets
43 / 60
72% complete · 7 behind
Progress
Work FrontTargetsIssuesBlockedUpdated
Tower B – 3F Slab
3/8
32Today
2 blockers4 targets behind
Tower A – 4F Columns
6/10
21Today
1 RFI open2 behind
Block B – Core & Stair
4/7
12Today
2 blockers1 NCR open
Tower A – 3F Finishing
12/15
Today
On track
Podium – Level 2
18/20
Today
On track
Basement – Zone C
No targets
Today
No targets set
What's blocking work
5 open · oldest first
Shuttering material not delivered — Tower B 3F work stopped
HindranceTower B – 3F Slab
needed by 22 Jun
5d
open
MEP clearance blocked — 3 open RFIs unresolved
RFITower A – 4F Columns
4d
open
Crane operator absent — slab pour on hold, 2 subcons idle
HindranceTower B – 3F Slab
needed by 23 Jun
2d
open
RCC inspection hold-point B5 — clearance pending
InspectionBlock B – Core & Stair
needed by 24 Jun
2d
open

Why construction managers love Velora

The operational shifts that happen from week one.

Velora tracks progress, commitments, and deliveries across your groups — reconciling each against the plan, the order, or the bill. Variances caught. Reports written.

Schedule

What changes when you stop reconstructing and start controlling.

No morning scroll

Start your day with signal, not scroll

Before your first call you're already spending 20 minutes scrolling back through groups to reconstruct what happened overnight. Velora surfaces what matters — progress flagged, issues open, action items outstanding — without the scroll.

Catch it before it slips

Blockers surface in minutes, not hours

A blocked work front starts as a single WhatsApp message. When it reaches you within minutes of being flagged, it's immediately actionable. When it surfaces hours later when someone calls, the schedule has already slipped.

45 minutes back, every evening

DPR, DLR, and bill summaries draft themselves

Velora drafts your DPR, DLR, and billing summary from the day's group messages — work front by work front, issue by issue. Review and confirm in minutes.

Cost

What changes when every delivery, work order, and attendance record is structured before the bill arrives.

Controlled before the invoice

Material reconciliation without the scroll

Three weeks after a delivery, the invoice arrives. Without a record, you're scrolling to verify it. Velora logs each delivery against the order as it happens — delivered, consumed, reconciled. Before the invoice, not after.

Evidence before payment

Work order completions documented automatically

Velora attaches the completion photos and confirmations from the group directly to the work order — timestamped, structured, ready before payment is released. Cost controlled at the point of completion.

Payroll you can verify

Attendance compiled without manual effort

Attendance from across your groups, compiled into a structured daily record automatically. Before payroll goes out, the record is there to verify against — not a chain of messages nobody reconciled.

No undocumented scope

Scope changes in chat flagged against formal change orders

When a scope change is discussed in a site group, Velora flags it and checks whether a formal change order exists. Work that proceeds without a CO costs margin — and creates disputes you can't win.

Quality

What changes when inspection requests and non-conformances don't disappear into chat.

Nothing missed at handoff

Inspections and quality checks tracked from request to closure

Every inspection and quality check is logged and tracked to closure — open, overdue, or done visible at a glance. Handoff surprises stop here.

Quality gate built in

Non-conformances resolved before they compound

A quality issue flagged in the group is captured, tracked, and followed through — not rediscovered three weeks later at handoff as a rework cost.

The business case your leaders will understand

When the project has control, the business absorbs less.

Schedule slips, cost overruns, and quality gaps don't start as large failures. They start as a blocked work front nobody escalated, a material delivery nobody reconciled, an inspection nobody followed through on.

When a construction manager has control over all three, those small misses get caught before they compound into margin the business can't recover.

The scale of that margin loss is documented. A 2024 study by Dodge Construction Network found that coordination gaps alone erode an average of 10% of annual company profit margin. Not execution failures. Not underqualified teams. The coordination layer.

Whether you're the business owner or the construction manager accountable for delivery — schedule, cost, and quality control is your strongest lever on margin. Velora puts that control where the work actually happens.

Three levers. One control point.
Construction Manager
Powered by Velora
Schedule
Blockers flagged within minutes
Commitments logged & tracked
DPR auto-drafted daily
Cost
Every delivery reconciled
Invoices verified
Payroll cross-checked
Scope changes flagged
Quality
NCRs tracked to closure
Inspections followed through
Handoff evidence ready
Less slippageLess leakageLess rework
Result
Margin stays in the business.

Pricing

Always On. Runs on your existing WhatsApp numbers.

All features in every plan — Dashboard, Execution tracking, Materials, Work Orders, Crews, Equipment, Change Orders, Billing, Reports, and Platform. Nothing locked behind a higher tier.
Pilot

Run Velora on one project. See what's already buried in your groups.

$99/month
  • 1 project
  • 5 groups
  • 1 connected number
Fair AI Usage
Unlimited Users
Get Started
Small Contractor

For contractors running 2–3 concurrent projects across multiple subs and sites.

$299/month
  • 3 projects
  • 15 groups
  • 2 connected numbers
Fair AI Usage
Unlimited Users
Get Started
Most Popular
Growing Contractor

For contractors scaling across projects, subs, and sites — full portfolio control.

$499/month
  • 5 projects
  • 30 groups
  • 5 connected numbers
Fair AI Usage
Unlimited Users
Get Started
Enterprise

For large portfolios, outsourced PMs, or multi-entity operations. Tailored to your structure.

Custom
  • Unlimited projects
  • Unlimited groups
  • Unlimited numbers
Unlimited AI
Unlimited Users
Talk to Us

Want to see it on your own data first?

Export the chat history from your most active WhatsApp project group and share it with us. We'll run it and show you the insights Velora would surface from that data — progress updates, blockers, commitments, material deliveries, scope changes so that you know what to expect.

Show Me on My Data →
One-time · Paid

Want a deeper look before you commit?

The Billing Audit is a one-time paid engagement — we review your WhatsApp history, Project schedule, Excel trackers, and documents for one active project and deliver a findings report on where margin is leaking. No subscription required. Many customers start here.

Learn more about the Billing Audit →
Free

Looking just for DPR drafts?

Our free desktop app gives structured daily logs from your WhatsApp group chats — no subscription required.

→ Learn more about the free app

Services

Two ways to work with Velora beyond the subscription.

Most of what Velora does runs always-on against your live groups, plans & documents. These two engagements are different — one-time, paid separately, built for a specific moment.

One-time · Paid

Billing Audit

Find out where this project's margin is leaking — before you commit to anything.

We take a full export of your WhatsApp chats, Excel trackers, project schedule, and documents for one active project and run a structured audit: delivery-vs-order gaps, work order completions without verified evidence, untracked scope changes, attendance discrepancies, and schedule slippage against plan. Delivered as a findings report. No subscription required.

Different from "Show Me on My Data" — that's a free quick preview. The Billing Audit is a paid full engagement with a delivered report.

Get a Billing Audit →
Onboarding Add-on

Historical Data Migration

Starting Velora on a project that's already underway? Don't start your dashboard blank.

We migrate a project's history — past WhatsApp threads, Excel records, scanned documents — into Velora's structured tables. Work orders, material orders, attendance, and progress reflect the project's actual history, not just what's captured from go-live forward.

Ask About Migration →

See what Velora finds in your own project groups.

The schedule slips, cost impact signals, and quality issues we've described are already in your chats — just not structured, not tracked, not reconciled against anything. Share 1 active group chat export and we'll show you exactly what Velora finds, so you know what to expect. Your data, not a test demo.

Frequently Asked Questions

Common questions from construction managers who've seen PM tools fail before.

No. Your site teams keep using WhatsApp & documents exactly as they do today. Velora reasons across fragmented data sources — no new apps, no forms, no training. It also works in the language your teams are most comfortable in: English, Hindi, Telugu, Spanish, Arabic and more.

Velora connects to your groups through existing WhatsApp number (no business API needed) — one number or multiple. We recommend getting separate project-specific numbers though for privacy & enhanced functionality. Every message is processed to extract structured project data across schedule, cost, and quality. Nothing changes for your site teams.

Velora is built for the construction manager accountable for delivery — whether that's a project manager in a large GC, a site engineer managing an infra stretch, or an owner-operator running fit-out, prefab, or specialty contractor sites. If you're coordinating work across multiple WhatsApp groups and managing subcontractors, Velora is for you.

When a delivery is acknowledged in the group, Velora logs it and matches against open material orders. When a supplier bill arrives, Velora matches that to deliveries & orders and flags variances if any, for the construction manager to review and confirm — so verification is a decision, not a search.

Velora intakes measurement book data and gathers work completion photos & inspections data from WhatsApp chats to match against work orders and keeps it ready for construction manager's review. By the time payment is due, the evidence has been building throughout execution, not assembled in a rush at the end.

Non-conformances and inspections flagged in group messages are captured, logged with context, and tracked through to resolution. You see what's open, what's overdue, and what's closed — without reading every group message manually.

Velora extracts from whatever is in the groups from day one — structured or not.

As you see schedule, cost, and quality records building automatically from group messages, you'll naturally start directing site teams to share updates in the group rather than over calls or walk-ins.

Your site teams already prefer WhatsApp — and when sharing in the group saves them the effort of a separate call, they adopt without being asked.

No — it makes it automatic. Your DPR format stays the same. Velora drafts it from the day's group messages. You review and confirm before it goes out. The process is the same; the compilation burden goes away.

Velora connects to as many groups as your project needs. All outputs are consolidated into one project view — schedule, cost, and quality — without reading each group separately.

The simplest way: Velora generates a QR code for each work front. The construction manager prints them and sticks one at each location — House 7, Block B Level 3, whatever the work front is. Site teams scan the code, WhatsApp opens with the location pre-filled, they type their update and send. No coordination needed — every message maps to the right work front automatically.

On a project with 50 houses, that means 50 QR codes placed once at setup. After that, every scan-and-send lands in exactly the right place.

If someone skips the scan and just mentions the location in their message — 'House 12 plastering done' — Velora picks it up from the text automatically. QR codes make it frictionless; the text inference is the fallback.

PM tools ask site teams to change how they work. Site teams go back to WhatsApp within weeks because it's faster and already on every phone. Velora works on top of WhatsApp — not instead of it. Site teams change nothing. Schedule, cost, and quality control builds itself from what they're already saying.

Two ways. If you want a quick preview, share a WhatsApp group export with us — we'll run it through Velora and show you what it surfaces from your own data. No cost, no commitment.

If you want a proper look before deciding, the Billing Audit is the right starting point. We review a full project — WhatsApp history, Excel trackers, project schedule, and documents — and deliver a structured findings report on where margin is leaking. It's a one-time paid engagement, no subscription required. Many customers use it as their entry point before going live on Velora.

Site Pro setup takes one short onboarding call — we connect your WhatsApp groups, map your work fronts, update your contact roles and you are live. Your site teams change nothing about how they work.

Yes. Data is stored securely with role based access control, and privacy data is encrypted at rest using AES-256 standard.