Hindrances are always mentioned. Few reach the contract in time.
Most contracts give more time for delays the employer or its other contractors cause, if the contractor gives notice in time and keeps a record of the hindrance.
A gate pass on hold, mentioned for six months.
- Event on site (breaks here today)
- Clause it may trigger
- Notice window
- Raised on time
Workers held at the gate came up again and again in the site group, on and off for half a year. Not once did the chat mention a hindrance register, a notice or an EOT.
The hindrance started on the 3rd. The notice went months later.
- Event on site
- Clause it may trigger
- Notice window (breaks here today)
- Raised on time
Contracts ask for written notice within a set time of the event, or as soon as practicable. A notice sent late, or never, is the first thing the client contests.
Another contractor's soil on your laydown area. Nobody called it a hindrance.
- Event on site
- Clause it may trigger (breaks here today)
- Notice window
- Raised on time
Site posted it as something to work around. Under most EPC contracts, interference by the employer's other contractors is grounds for more time.
A day here, two days there. Then liquidated damages.
- Event on site
- Clause it may trigger
- Notice window
- Raised on time (breaks here today)
Each delay is too small to raise on its own, so none of them is. At the end, the delays that weren't yours have no record, and liquidated damages fall on all of it.
The delay was real. Without the record, the clause and the notice, the time is lost anyway, and the LDs still apply.
From a passing mention to the record your EOT claim needs.
Your site teams keep posting the way they do today. Nobody has to fill in a register.
Read
Every hindrance, as it's posted
Fronts not handed over, ROW and utility shifting, work held by another contractor, drawings, approvals or free-issue material awaited, gate passes and shutdowns: picked out of the site chats, in any language.
File
Logged as a hindrance
Each logged with the date it was first posted, the place, what it's holding and the photos, and kept open until site reports it cleared. Filter your issues by hindrance and you have the register.
CheckEarly access
Against your contract, in time
Where your contract is uploaded, each is matched to the clause it may trigger: the extension of time, the notice it calls for, the liquidated damages rate and cap, and the records to keep. Whoever you choose is alerted the same day and reminded before the notice period runs out.
FlagEarly access
Set out for your EOT claim
The hindrance report: each hindrance with when it started and when site reported it cleared, and the posts and photos behind it, as the hindrance register your EOT claim is argued from. Your team decides what to raise, sends any notice and makes the claim.
Recording hindrances is part of the site record, live today. The clause matching and notice reminders, where your contract is uploaded, and the hindrance report are early access: in the pilot, our team sets them up with you.
Your hindrances, logged from the chats.
Every hindrance on a package, logged from the day it was first posted until site reports it cleared. Filter your issues by type and they read as a register. Each entry opens into the messages and photos behind it.
Illustrative figures
Dated from the first post
The start is the day site first mentioned it, not the day someone got round to the register.
Open until cleared
Each stays open while site keeps reporting it, and closes when site reports it cleared.
With what it held
The front, the crew or the activity it stopped, as site described it.
Ready when the EOT is due
The messages and the photos are there for the notice and the claim, not rebuilt from memory. In early access, the hindrance report sets them out for your EOT claim.
Recorded on site, flagged against your contract.
Hindrances come from the same site record as progress and deliveries. These pages show the rest, or teach the job by hand.
Keep the time and money your contract gives you.
Talk to us about one live project and we'll set up a pilot against its WhatsApp groups and your contract.
We start with a three-month pilot, working closely with your team. On your live sites, at a heavily discounted pilot rate and with no long-term commitment.
- Onboarded with your team
- Tuned to how your teams work
- Refined on your feedback
Frequently asked questions
Common questions from project heads, planning engineers and contracts teams.
A running log of everything that stops or slows the work: what happened, where, when it started and ended, and which activities it held. On EPC contracts, joint hindrance register entries are often a principal basis for deciding extensions of time; on CPWD works, hindrances are recorded in the site order book. Velora logs each hindrance from your site groups as it's posted, so the register can be filtered from your issues rather than written up afterwards.
Guide: how to claim an extension of time and document the delay →
Each hindrance with the day site first posted it and the day site reported it cleared, or that it is still open; how many days it was open; and the posts behind it in the words they were written, with their photos. It is the hindrance register your EOT claim is argued from. The report is early access: in the pilot, our team prepares it with you, and your team decides what goes in the claim.
Liquidated damages: each flagged delay shows the LD rate and cap from your contract. A running total as delays add up is something the team is still working on. Also the notice periods your contract sets, and the clauses that are easy to miss, like repeat repairs, rectification deadlines and defect-liability terms. Each is flagged for your team to look at.
No. Velora records the hindrance, flags the clause it may trigger and the notice it calls for, and reminds whoever you choose before the window closes. Your team decides what to raise, writes the notice and makes the claim, with the record ready behind it.
The contract you upload, whatever the form, including EPC, Railways and CPWD-based conditions. Its notice periods, extension of time and liquidated damages terms are read from it as written, and you add the key dates they count from, such as the appointed date and the completion date. Text-based PDFs in English work today; scanned contracts are something the team is still working on.
No. Hindrances are recorded from your site groups from the first day, with or without a contract. Uploading the contract adds the clause matching and the notice reminders.
Those are logged too. A late drawing or an approval awaited is logged with its date and checked against the clause it may trigger, the same way.
Yes. On jobs with a fixed handover date and no extension clause, as on many fit-outs, the same dated record of each hold-up is there when the handover date is questioned, to agree a revised one with your client.
No. Velora flags where a site update may trigger a clause, with the likely clause, the deadline and the proof to keep. Your team, with your contracts or legal advisers where needed, decides what to raise.
Recording hindrances is part of the site record and available today. The contract side is early access: where your contract is uploaded, the clause matching, the notice reminders and the LD rate and cap, and the hindrance report for your EOT claim. We set them up with you on a pilot project, and our team prepares the report with you.
We run a discounted pilot for the first three months on one project: the full product, with no long-term commitment.