Stop compiling the DPR from calls every evening. Your reports, drafted from what site already posts.

Progress, manpower, machinery, deliveries and blockers are posted in your site groups all day. Velora records them through the day and drafts the daily, weekly and monthly reports from that one record, sent on a schedule to whoever needs them. No new app and no new format for site teams.

A daily report, every evening. Work done by location with its quantities against scope, and manpower by contractor, from the day's updates.
Weekly and monthly from the same record. Progress against scope, a written weekly report, deliveries by vendor and consumption, without rebuilding anything.
Sent on a schedule. Each report on its own day and time, on WhatsApp or email, to the PM, HO or the client.
Package 2 · Site Updates
Highway Package 2 · Sunil, Velora +8
Sunil
Ch 112+340 LHS patch done, L 2.4 W 1.5. Ch 114+050 RHS L 3 W 1.8
4 photos
4:52 PM
Package 2 · Manpower
Imran, Velora +5
Imran
Today manpower: Sai Constructions 18, RK Labour 21, own 7
1 photo
5:30 PM
Store · Receipts
Ramesh, Velora +3
Ramesh
Emulsion received, 2 MT, Ganga Bitumen
Invoice photo
5:52 PM
+4 More Groups
Velora
Today · Highway Package 2Updated 6:40 PM
Pothole and patch repair62.4 sqm
17 patches today, each with its chainage, size and photo
Ch 108+920 LHS6.0 × 2.0 m11:05 AM12.00 sqm
Ch 112+340 LHS2.4 × 1.5 m4:52 PM3.60 sqm
Ch 114+050 RHS3.0 × 1.8 m4:52 PM5.40 sqm
BillIn today's Progress vs Scope
Manpower46
Sai Constructions 18 · RK Labour 21 · own 7
PayIn the Daily Manpower Report
Bitumen emulsion RS-12.0 t
Ganga Bitumen · invoice photo kept
PayIn the deliveries report
Suresh · Project Manager
Daily reports
Daily Progress vs Scope
Hi Suresh, here's the Daily Progress vs Scope for Oct 24, 2026 — everything recorded up to the end of Sat, Oct 24.
Highway Package 2 Progress vs Scope (Oct 24, 2026).xlsx
7:00 PM ✓✓
Anil · Head Office
Daily reports
Daily Manpower Report
Hi Anil, here's the Daily Manpower Report for Oct 24, 2026 — everything recorded up to the end of Sat, Oct 24.
Highway Package 2 Manpower Report (Oct 24, 2026).xlsx
7:00 PM ✓✓
Sent on WhatsApp or email, every evening

Where the evening goes

Everything in the report was already posted. Someone types it up again.

The DPR is retyped every evening, and the weekly and monthly reports are rebuilt from it. Nearly all of it was already posted in the groups, and gets typed up again from memory and calls.

Compiled from calls

The DPR is built at 7 pm, from memory.

The site engineer rings each foreman and types up what they remember, after a full day on site.

What was posted in the groups at 11 am, with photos, often isn't what reaches the report.

Two versions of the day

The group says one thing. The DPR says another.

A patch size in a caption, a labour count in another group, a delivery in a third.

When the DPR is retyped, numbers drift, and nobody can say which version the bill or the client should trust.

Rebuilt every week

The weekly report, rebuilt from seven DPRs.

The weekly and monthly reports are rebuilt from the dailies and a scroll-back, in another format for the client.

The same work is typed three times, and the monthly report is late.

Labour on paper

Headcounts by contractor, added up by hand.

Each labour contractor's count is posted in a different message, some as a photo of the register.

The daily labour report is totalled by hand, and the month's total by contractor is never quite right.

The information is all there. The typing is what eats the evening.

How Velora does it

One record, every report.

Your site teams keep posting the way they do today. The reports come from what they post.

  1. Read

    Every update, as it arrives

    Progress, manpower counts, machinery, deliveries, fuel, blockers and photos, from text, voice notes and photos of registers, in any language.

  2. File

    By location and scope

    Each update filed by work front and location, matched to its scope line, with quantities worked out from captions and marked as calculated, stated or counted.

  3. Check

    Drafted for review

    Each report is drafted in its format from the record. Have it sent on schedule, or generated in the app for the engineer to check first.

  4. Flag

    Sent on schedule

    Each report goes out on its own day and time, on WhatsApp or email, to the people set up for it.

Need a single-site DPR without a pilot? The free DPR Generator drafts one on your own computer.

Worked example

Every report on its own schedule.

The reports one project sends, each set up once with its recipients. All of them are drafted from the same site record.

  • Daily, to the PM

    Work done against scope and manpower by contractor, every evening.

  • Weekly, to the client

    A written progress report, as a Word document.

  • Monthly, to billing

    The month's quantities against scope, each with how it was measured.

  • To accounts and the plant

    Deliveries by vendor and fuel consumption by machine, on their own days.

Report schedule · Highway Package 2
Each set up once, with its recipients
Daily Progress vs Scope
Every day, 7:00 PM · Project manager, planning
WhatsApp
Daily Manpower Report
Every day, 7:00 PM · Project manager, HO
WhatsApp
Weekly Progress Report
Mondays, 9:00 AM · Client's engineer (Word)
Email
Monthly Progress vs Scope
1st of the month · Billing head
Email
Weekly Material Deliveries Report
Fridays, 6:00 PM · Accounts
WhatsApp
Monthly Material Consumption Report
1st of the month · Plant in-charge
WhatsApp

Illustrative schedule

Get tonight's report without the typing.

Talk to us about one live project and we'll set up a pilot against its WhatsApp groups and your scope.

Frequently Asked Questions

Common questions from project managers, planning engineers and site engineers.

Work done by location with quantities, manpower by trade or contractor, machinery, material received, blockers, and photos, against the plan or scope. Velora drafts the work done against scope and manpower by trade and contractor every day, with deliveries and consumption as their own reports; blockers and photos go in the weekly report. Machinery in the reports is something the team is still working on. The guide covers the format if you build it by hand.

Guide: daily progress report format →

Progress against scope daily, weekly and monthly; manpower reports daily, weekly and monthly; a written weekly progress report as a Word document; and material deliveries and consumption reports. Each goes on its own schedule, on WhatsApp or email.

Reports come in Velora's formats, as Excel or Word files. Filling a client's own template is something the team is still working on.

The DPR Generator is a free Windows app that drafts a narrative DPR for one site, on your own computer. Velora reads every group on every project, files each update by location and scope, and sends the daily, weekly and monthly reports on a schedule.

DPR Generator →

Yes. Velora reads text, voice notes and photos in the languages your teams use, including photos of registers and log sheets, and keeps each original message with the record it created.

We run a discounted pilot for the first three months on one project: the full product, with no long-term commitment.