Skip to main content

Stop hunting for proof at bill time. Get bills certified faster.

Work done on site matched to your project scope, item by item, with the evidence behind it collated — so none of it is left off the monthly claim.

Certified faster. Every bill line carries its supporting documents: quality checklists, level surveys, lab results and site photos.
Less chasing. Velora gathers them from the site record and follows up on missing documents on WhatsApp.
Velora
Supporting DocumentsBefore
Riser R2
Photos ✓Pressure test ⏳Checklist ⏳
Column C4
Checklist ⏳
Site Team · Daily Updates
Ravi, Greg, Velora +6
Ravi
Column C5 shuttering started.
08:00 AM
Greg
Riser R2 pressure test passed ✓
10:30 AM
Velora
Supporting DocumentsUpdated
Riser R2
Photos ✓Pressure test ✓Checklist ✓
Column C4
Checklist ⏳
Column C5NEW
Checklist ⏳
Arjun · Billing Engineer
Supporting documents
New Work Item
Column C5 work started, but it isn't tracked yet. Track it and start chasing the pre-pour checklist?
08:02 AM ✓✓
Arjun
Yes, track it.
08:05 AM
Closed Out
Riser R2 complete. Pressure test passed and the signed quality checklist received, so its supporting documents are in.
10:46 AM ✓✓
Site Team · QC
QC Team, Velora +3
Column C5 now tracked. Please share the pre-pour checklist when ready.
08:06 AM ✓✓
Riser R2 pressure test passed — please share the signed quality checklist (pre, during, post).
10:32 AM ✓✓
Contractor QC Lead
Signed checklist attached — pre ✓ during ✓ post ✓
Checklist + test report
10:44 AM
Delivered automatically, every day

Where billing leaks

Every one of these was completed. Every one still slipped.

Capture the work, match it to scope, substantiate the bill — three jobs, held together by someone doing it by hand.

Capturing work done

Six updates in ten minutes. One never reached the record.

End of shift, the site group lights up: a pour, a delivery, two hindrances, a labour count, and "kerb laying done, 12+400 to 12+650". The evening DPR picks up five.

The kerb laying never reaches the progress record, so there's nothing to bill. The work was done; the bill never saw it.

Matching to project scope

Delineators installed at Ch. 18+100–18+400. Never billed.

"Delineators fixed, 18+100 to 18+400, both sides" — one line in the site group, between a pour update and a delivery. The BOQ has an item for it; nobody tied the message to it.

Working through hundreds of updates at month-end, the billing engineer missed it — along with the other small items that only ever appeared in chat.

Substantiating the bill

9 lines short of proof. Retention goes from 5% to 20%.

The quantities reconcile against scope. But every line needs its supporting documents behind it: a signed checklist, a level survey, a lab result. On 9 lines, one is missing.

Without them, the client holds 20% retention instead of 5% — an extra 15% of the bill's value, until the documents arrive.

Reconciling small jobs

Hundreds of patch repairs. One BOQ item.

Every pothole filled is reported as a photo captioned with chainage, length and width — often with no unit, often in a burst of photos of the same patch. At month-end, someone collates hundreds of them into one quantity.

Miss a patch and it's never billed. Count a burst twice and the engineer starts checking every line. And every patch needs its photo before the bill is certified.

Every client pushes bill certification to month-end. Chase fourteen sites by hand — and the sleepless night is yours, not theirs.

What we keep hearing

The more bills you compile, the easier something slips.​

Payment held until every checklist is in.

We eventually get paid for everything we're contracted for — that's not the problem. Jab client paisa rok leta hai na at month-end, raat ko neend nahi aati. Sardard ho jaata hai. The real issue is collecting 80 to 100 checklists every month, across projects from multiple departments, before the last week closes in.
Billing HeadEPC Contractor

A 210-day working capital cycle.

Our working capital cycle runs 210 days — crores blocked every year, pure interest loss, before we've even talked about the work itself. Even the BOQ claims that get approved still roll into the next month; recognizing that revenue takes three to four months end to end.
CEOSpecialty Waterproofing Contractor

Quantities missed. Bills come up short.

A lot of our setup work isn't in the BOQ at all — we have to track it separately just to know what it cost us. And across chainages, teams sometimes miss reporting quantities entirely, so the BOQ ends up underbilled.
GM ProjectsGovernment Infra O&M Contractor

100 projects. Every document collated by hand.

We're running close to a hundred client projects. At month-end, someone still has to manually coordinate across departments just to collate the checklists, labor compliance and TBT evidence for each one.
Contracts & Claims LeadSpecialty Waterproofing Contractor

The Fix

Work done captured, matched to project scope and substantiated — before the bill goes out, for your team to review and finalise.

Before
Ravi · Site Engineer
Rebar for column grid C4 approved, QC signed off 👍
11:20 AM ✓✓

One photo. Buried by the next billing cycle.

After
Matched
RCC — Column Grid C4
Matched to scope item — 4.2t executed this month, with its photos and the signed rebar checklist.
Ready for Bill-14

Filed, matched and flagged for your review.

How it works

One WhatsApp QR Scan. Zero Change for Your Teams.

Add Velora to your existing WhatsApp groups. Your teams keep working as they do, whether there's one record to chase or a hundred.

01
Read

Captures work done as your teams report it

Quantities, photos, checklists, level surveys and lab results are captured from your site, QC and billing groups as they're posted. Work nobody planned to bill this month goes to your billing engineer to confirm.

02
File

Matched to project scope

Each update is matched to its BOQ item or billing break-up line, executed quantity against scoped. Anything unclear is held for your billing engineer, not guessed. Velora tracks quantities; your team adds rates.

03
Check

Checked for what each bill line still needs

Matched work becomes suggested bill lines, each checked for the supporting documents it needs, such as quality checklists, level surveys, lab results and site photos: received or still missing.

04
Flag

Ready for this month's bill, not next month's

Missing documents are followed up on WhatsApp with whoever holds them. Your billing team reviews the lines and finalises the bill.

Data Sources

WhatsApp Groups
Project Scope / BOQ

Involved Parties

Site QCBilling Engineer
Velora

Velora AI

Read
File
Check
Flag

What You Get

Work done captured from site updates
Work done matched to project scope
Bill line items suggested from matched work
Missing records followed up before cut-off

What Velora Delivers

Billing intelligence — without changing how bills get compiled.

Work Capture

Work done picked up from site updates, by work front, including work nobody planned to bill.

Quantities, progress and photos come from the WhatsApp updates your site teams already send. Unplanned work goes to your billing engineer to confirm, so its supporting documents are gathered from the start instead of it being left out.

Site Team · Daily Updates
Ravi, Greg, Velora +6
Ravi
Column C5 shuttering started.
08:00 AM
Greg
Riser R2 pressure test passed ✓
10:30 AM
Arjun · Billing Engineer
Supporting documents
New Work Item
Column C5 work started, but it isn't tracked yet. Track it and start chasing the pre-pour checklist?
08:02 AM ✓✓
Arjun
Yes, track it.
08:05 AM
Closed Out
Riser R2 complete. Pressure test passed and the signed quality checklist received, so its supporting documents are in.
10:46 AM ✓✓

Scope Matching

Work done matched to each scope line, from a BOQ, work order or EPC billing break-up, feeding the suggested bill lines.

Reported quantities are tracked against the scoped quantity. Updates without one are still matched by activity, with work front, date and photos. Anything unclear is held for your billing engineer. Import scope from your BOQ, break-up, work order or contract; Velora tracks quantities, your team adds rates.

Scope Matching
This month's bill
1 flagged
RCC-C4
RCC — Column Grid C4
2.4t of 4.2t scoped
27 Mar·Tower B · 3F2.4t
29 Mar·Tower B · 3F3
EL-DB4
Electrical — DB panels, Level 4
14 nos of 14 nos scoped
24 Mar·Level 4 · Electrical14 nos6
Field-reported quantities matched directly; entries without one still matched by activity.

Bill Substantiation

The supporting documents your client asks for, gathered against each bill line: quality checklists, level surveys, lab results, site photos and whatever else your contract needs.

Quality checklists, RFIs, level surveys, lab results and site photos shared on site are filed against the work they cover, and missing ones are followed up on WhatsApp with whoever holds them. Documents kept off WhatsApp, such as the measurement book, are uploaded once for the bill. Your billing engineer reviews each line and finalises it.

Bill Substantiation
Bill-14 · This month
0%
RCC — Column Grid C4
2.4t / 4.2t· progress mapped
Electrical — DB panels L4
14 nos / 14 nos· progress mapped
Progress mapped to scope, rolled into the claim.
Evidence Tracker
Supporting documents · This month
Column Grid C4
Photos ✓Cube test ⏳Checklist ⏳
DB panels L4
Photos ✓IR test ✓Checklist ✓
Measurement book · Bill-14
Uploaded ✓
Checklists, tests, photos and the measurement book, tracked.
Site Team · QC
QC Team, Velora +3
Velora
Due Checklists
3rd week of the month — bill cut-off approaching. Checklists pending — 3 total, 1 carried forward: Reinforcement — 2 pending: RF-TwrB-3F, RF-TwrB-4F
09:00 AM ✓✓
Contractor QC Lead
RF-TwrB-3F — signed checklist attached, pre ✓ during ✓ post ✓
3 photos
11:20 AM
Captured
RF-TwrB-3F logged — matched to Bill-14. RF-TwrB-4F still pending.
11:21 AM ✓✓

The impact

The operational shifts that happen from the first bill.

Work done captured. Matched to project scope before the bill goes out. Every line substantiated. These are the shifts billing teams notice first.

What changes when nothing has to be reconstructed, chased, or rediscovered later.

Work done billed this month, not next

Work done captured and matched to project scope, ready to review

Field-reported quantities are matched to their scope item directly. Where no quantity was given, the progress record — work front, date, photos — is still matched by activity, so review starts from what was actually reported, not a guess.

Supporting documents, chased for you

Missing documents followed up on WhatsApp until they're in

Velora messages whoever holds the outstanding checklist, level survey or lab result directly on WhatsApp, and follows up until it’s received. Less end-of-cycle scramble.

Bills certified faster

Suggested bill line items with supporting documents attached

Executed quantities matched to scope sit with their quality checklists, level surveys, lab results and site photos, filed under the bill line each belongs to. Your billing team reviews and finalises, instead of reconstructing it at month-end.

A record you can defend: every update traces back to the WhatsApp message and site photo it came from.

See it assist your next bill claim.

Talk to us about your billing process and we'll set up a pilot against your live sites and existing WhatsApp groups.

Frequently Asked Questions

Common questions from billing and cost heads, billing engineers and project managers evaluating Velora.

No. Your teams keep using WhatsApp exactly as they do today. Velora reads the same groups you already use — progress updates, checklist sign-offs, lab results — and files each update against the scope item it likely belongs to, for your billing engineer to confirm. No new app, no forms.

Messages are matched against your project scope (imported from your BOQ, billing break-up, work order or contract) using the work front, activity, and context in the message — the same way a billing engineer would read it manually. Velora raises what it detects, and the billing engineer makes the final call — never a silent guess.

No. Velora works on scope versus executed, not on rates, and every contract has scoped quantities. On an item-rate contract they're in the BOQ. On an EPC or lump-sum contract, the price is often broken into line items with quantities (a billing break-up) that each monthly bill is raised against. Either way, work done has to be matched to those lines to raise the monthly bill. Import scope from whichever document holds it.

Yes, where repairs and jobs are paid against BOQ or work order items. On a highway maintenance contract, for example, each pothole or patch repair reported in the group with its chainage and size is recorded against its location, its area worked out for your billing engineer to confirm, matched to the repair item and kept with its photos, so the month's quantity for that item builds up as the work is reported, with the proof behind every patch. On an HVAC, electrical or plumbing rate contract, each repair is billed against its rate item and attendance alone rarely substantiates it: the job photos and signed checklists your technicians share from each site are filed against the line they belong to, so the bill carries proof of the work.

Guide: how to reconcile and substantiate a road maintenance bill →

No. Velora tracks quantities, not rates: what's scoped for each line, what's been executed on site, and what's still to be claimed. Your billing engineer keys rates into the bill as they do today.

Right now, Velora follows up with QC or the PM on WhatsApp for any checklist, level survey or lab result still outstanding, and they coordinate with the subcontractor from there.

Bill line items, built from work done matched to each scope line (BOQ item or billing break-up line), with supporting documents. Your team keys in rates, adds anything missing and finalises the bill, whether that's an RA bill, an interim payment application or a progress claim.

Whatever your client needs to certify the bill, such as quality checklists, level surveys, lab results, site photos and the measurement book. Documents shared on site are filed against the line they belong to, each traced back to the WhatsApp message it came from; documents like the measurement book are uploaded once per bill by your billing engineer.

The list is set for each project, so a contract that needs less, or something extra such as labour compliance records, gets exactly that. Your billing engineer reviews what each line carries before the bill goes out.

Every site update is matched to a scope line. Work reported on site that nobody planned to bill this month is flagged to your billing engineer to confirm. Nothing is added without confirmation.

No. It's a partnership: AI suggests bill line items and gathers the supporting documents; your billing team reviews, adds anything missing and finalises the bill.

Both, and your own EPC billing cycle too — the contract format doesn't change how quantities are checked or evidence is filed.

We run a discounted pilot for the first three months — full product, no long-term commitment. See what it surfaces on your own sites before committing to a subscription.

Yes. Data is stored securely with role based access control, and privacy data is encrypted at rest using AES-256 standard.