Skip to main content

Stop hunting for evidence at bill time. Bill what's ready, faster.

Evidence collated and quantities cross-checked against the contract BOQ, flagging anything that looks likely to be missed before the monthly claim goes out.

Reconcile → every quantity auto-attached to the BOQ line, ready for your review
Chase → evidence collected automatically, checklist by checklist
Package → a bill claim ready to submit, evidence attached
Velora
Pending ChecklistsBefore
Slab S3
Pre ✓During ✓Post ⏳
Column C4
Pre ⏳
Tower B · Site Updates
Ravi, Greg, Velora +6
Ravi
Column C5 shuttering started.
08:00 AM
Greg
Slab S3 pour completed ✓
10:30 AM
Velora
Pending ChecklistsUpdated
Slab S3
Pre ✓During ✓Post ✓
Column C4
Pre ⏳
Column C5NEW
Pre ⏳
Arjun · Billing Engineer
Checklist tracking
New Work Lot
Work started reported for Column C5 — no tracker entry found. Track this and start chasing the pre-stage checklist?
08:02 AM ✓✓
Arjun
Yes, track it.
08:05 AM
Closed Out
Slab S3 work completed. Quality checklist received — pre, during and post, signed by client.
10:46 AM ✓✓
Tower B · Site QC
QC Team, Velora +3
New work lot logged: Column C5. Please share the pre-pour checklist when ready.
08:06 AM ✓✓
Slab S3 marked complete — please share the signed quality checklist (pre, during, post).
10:32 AM ✓✓
Contractor QC Lead
Signed checklist attached — pre ✓ during ✓ post ✓
3 photos
10:44 AM
Delivered automatically, every day

Where billing leaks

Every one of these was completed. Every one still slipped.

Reconcile the quantity, chase the evidence, package the claim — three jobs, and the only thing holding them together is someone doing it by hand.

Reconciling the quantity

450 m of earthwork at Ch. 12+400–12+850. Never billed.

Reported in the group the day it happened, like every other chainage. But nobody could verify it in person — the PM and billing engineer can't be at every chainage, every day.

By bill time, that stretch never made it onto the BOQ line. Multiply that across every chainage, every month.

Chasing the evidence

29 checklists pending. 3 days to bill review, across 3 sites.

Three high-rises, three clients, all reviewing bills on the 25th. 70, 53 and 61 work completions — each needing a signed QC checklist before it can be billed.

Three days out, 29 are still missing — 12, 8 and 9 per site. Chasing QC and each PM's group, because whatever isn't in hand by the 25th slips to next month.

Packaging the claim

9 checklists missing. 12% of the claim can't be certified.

The quantities reconcile — the work is there, verified against the BOQ. But the package still needs a signed checklist behind every line, and 9 are missing across the claim.

Without them, the client won't certify that 12% of the bill — so retainage jumps from 5% to 20% on it instead. That's 1.8% of this month's claim value pushed to next month's cycle.

Every client wants it certified by month-end. Chase fourteen projects by hand — and the sleepless night is yours, not theirs.

What we keep hearing

The more bills you compile, the easier something slips.​

Not lost pay — 100 checklists a month, chased by hand.

We eventually get paid for everything we're contracted for — that's not the problem. Jab client paisa rok leta hai na at month-end, raat ko neend nahi aati. Sardard ho jaata hai. The real issue is collecting 80 to 100 checklists every month, across projects from multiple departments, before the last week closes in.
Billing HeadEPC Contractor

210-day working capital cycle — approved claims still take 3–4 months to recognize.

Our working capital cycle runs 210 days — crores blocked every year, pure interest loss, before we've even talked about the work itself. Even the BOQ claims that get approved still roll into the next month; recognizing that revenue takes three to four months end to end.
CEOSpecialty Waterproofing Contractor

Setup work off the BOQ. Chainage quantities missed. Underbilled.

A lot of our setup work isn't in the BOQ at all — we have to track it separately just to know what it cost us. And across chainages, teams sometimes miss reporting quantities entirely, so the BOQ ends up underbilled.
GM ProjectsGovernment Infra O&M Contractor

100 client projects. Checklists collated by hand, every month-end.

We're running close to a hundred client projects. At month-end, someone still has to manually coordinate across departments just to collate the checklists, labor compliance and TBT evidence for each one.
Contracts & Claims LeadSpecialty Waterproofing Contractor

The Fix

Evidence collated & progress mapped to BOQ — automatically, before the bill goes out.

Before
Ravi · Site Engineer
Rebar for column grid C4 approved, QC signed off 👍
11:20 AM ✓✓

One photo. Buried by the next billing cycle.

After
Matched
RCC — Column Grid C4
Matched to BOQ line — 4.2t not yet claimed.
Flagged before Bill-14 goes out

Filed, reconciled, flagged — automatically.

How it works

One WhatsApp QR Scan. Zero Change for Your Teams.

Add Velora to your existing WhatsApp groups. Your teams keep working exactly as they do — the same whether you're chasing one checklist or a hundred.

01
Capture

Captures every quantity, checklist and sign-off your teams already send

Connect Velora to your site, QC and billing engineer WhatsApp groups. Photos, checklists, sign-offs — captured as they happen.

02
Extract

Every submission structured against the work lot

Quantities, checklists and evidence matched to the right work lot and BOQ line automatically.

03
Analyze

Checked against the tracker, checklist by checklist

Work lot status cross-checked against QC checklists — pending, collected, missing — for every bill in cycle.

04
Surface

Flagged before the bill goes out — not after

Anything not yet certified is flagged to the billing engineer while there’s still time to chase it.

Data Sources

WhatsApp Groups
Work Lot Tracker

Involved Parties

Site QCBilling Engineer
Velora

Velora AI

Capture
Extract
Analyze
Surface

What You Get

Pending checklists chased automatically
Work done matched to the BOQ line
Missing evidence flagged before cutoff
Bill package draft ready to review and finalize

What Velora Delivers

Billing intelligence — without changing how bills get compiled.

BOQ Reconciliation

Work done matched to the BOQ line — ready to review and finalize before the bill is due.

Field-reported quantities are matched to the BOQ line directly. Where no quantity was given, the progress record — work front, date, photos — is still matched by activity, so review starts from what was actually reported, not a guess.

BOQ Reconciliation
Tower B · This month's bill
1 flagged
RCC-C4
RCC — Column Grid C4
2.4t / 4.2t
27 Mar·Tower B · 3F2.4t
29 Mar·Tower B · 3F3
WP-PZ1
Waterproofing — Podium Zone 1
450 sqm / 450 sqm
24 Mar·Podium · Zone 1450 sqm6
Field-reported quantities matched directly; entries without one still matched by activity.

Bill Packaging

Two lines converge into one claim: BOQ-mapped progress, and evidence chased and captured automatically.

Every accepted BOQ line rolls into the package with its mapped progress attached. Every checklist and sign-off — tracked through the work lot tracker, chased from field updates on WhatsApp — rolls in alongside it, indexed to the claim line it belongs to. Ready to hand to the client or consultant, not reconstructed at the last minute.

Bill Package
Bill-14 · Tower B
0%
RCC — Column Grid C4
2.4t / 4.2t· progress mapped
Waterproofing — Podium Z1
450 sqm / 450 sqm· progress mapped
BOQ-mapped progress, rolled into the claim.
Evidence Tracker
Work lots · Tower B
Column Grid C4
Pre ✓During ✓Post ⏳
Podium Zone 1
Pre ✓During ✓Post ✓
Every work lot's checklist status, tracked.
Tower B · Site QC
QC Team, Velora +3
Velora
Due Checklists
3rd week of the month — bill cut-off approaching. Checklists pending — 3 total, 1 carried forward: Reinforcement — 2 pending: RF-TwrB-3F, RF-TwrB-4F
09:00 AM ✓✓
Contractor QC Lead
RF-TwrB-3F — signed checklist attached, pre ✓ during ✓ post ✓
3 photos
11:20 AM
Captured
RF-TwrB-3F logged — matched to Bill-14. RF-TwrB-4F still pending.
11:21 AM ✓✓

The impact

The operational shifts that happen from the first bill.

No evidence hunt. Quantities reconciled before the bill goes out. Claims that package themselves. These are the shifts billing teams notice first.

What changes when nothing has to be reconstructed, chased, or rediscovered later.

Nothing left uncleared

Work done matched to the BOQ line, ready to review

Field-reported quantities are matched to the BOQ line directly. Where no quantity was given, the progress record — work front, date, photos — is still matched by activity, so review starts from what was actually reported, not a guess.

Evidence chases itself

Checklists chased automatically, until they're in

Velora messages whoever holds the outstanding checklist or document directly on WhatsApp — and keeps chasing until it’s received. No more end-of-cycle scramble.

A claim ready to send

Bills package themselves, evidence attached

BOQ-mapped progress and accepted evidence roll into the bill claim together, indexed to the line each belongs to. What used to take days of reconstruction is ready to hand to the client the moment the cycle closes.

See it assist your next bill claim.

Talk to us about your billing process and we'll set up a pilot against your live projects and existing WhatsApp groups.

Frequently Asked Questions

Common questions from billing engineers and contract administrators evaluating Velora.

No. Your teams keep using WhatsApp exactly as they do today. Velora reads the same groups you already use — QC sign-offs, delivery updates, checklist submissions — and files everything against the right BOQ line automatically. No new app, no forms.

Messages are matched against your BOQ / pay-item structure using the work front, activity, and context in the message — the same way a billing engineer would read it manually. Velora raises what it detects, and the billing engineer makes the final call — never a silent guess.

Right now it's a simple setup: each work lot has its own checklist tracker, and Velora follows up directly with QC or the PM on WhatsApp for whatever's still outstanding on it — they coordinate with the subcontractor from there.

No — it cuts an estimated 30-50% of the manual work: tracking pending evidence, chasing checklists, cross-checking quantities by hand. Your billing engineer still reviews and confirms every claim — the crunch in the last week of the month just gets a lot lighter.

BOQ-mapped progress for every claim line, plus the accepted evidence behind it — checklists, sign-offs, quantities — compiled per claim and ready for the billing engineer to review, modify and finalize before it goes to the client or consultant.

Both, and your own EPC billing cycle too — the contract format doesn't change how quantities are checked or evidence is filed.

We run a discounted pilot for the first three months — full product, no long-term commitment. See what it surfaces on your own projects before committing to a subscription.

Yes. Data is stored securely with role based access control, and privacy data is encrypted at rest using AES-256 standard.