Skip to main content

Stop chasing updates. Stop drafting reports. Focus on running the project instead.

Velora turns your team's WhatsApp chats, voice notes and photos into project updates, reports and actionable intelligence — automatically. Your team continue working the way they already do. Velora does the tracking, reporting and follow-up.

Track → progress, blockers, commitments — auto-logged
Prove → inspections, deliveries, evidence — auto-filed
Report → work done, manpower and client updates — auto-drafted
Tower B · DPR
Ravi, John, Greg, Velora +5
John
Crane operator absent, pour on hold.
6:30 AM
Blocker
Tower B — 3F Slab pour on hold. Escalated to Site PM.
6:31 AM ✓✓
Tower B · Manpower
Suresh +2
Suresh (Site)
Today: Mason 6, Helper 10, Electrician 3. Ramesh (Electrician) not reported.
7:45 AM
Attendance
19 present, logged. Ramesh (Electrician) absent — flagging no-show.
7:46 AM ✓✓
+6 More Packages
Velora
Progress
2 tracked · 1 behind
vs target
Tower A – L12 Slab
Concrete · 118 / 120 m³ (−2)
Podium – Zone 1
Waterproofing · 480 / 450 sqm (+30)
Open Issues
2 open · 1 resolved
action needed
Shuttering not delivered
Tower B – 3F Slab · 5d
Crane operator absent
Tower B – 3F Slab · 2h
Action Items
2 open · 2 critical
today
Escalate shuttering delivery
Site PM · Today
Arrange relief crane operator
Site PM · Today
Attendance
19 present · 3 trades
auto-compiled
Electrician
2 of 3 — Ramesh absent
Mason · Helper
6 pax · 10 pax
Rohan · Project Manager
Daily Pulse
Focus today: — Crane operator absent, Tower B 3F pour on hold — 2h — Ramesh (Electrician) did not report, Tower B — 1h Yesterday: — Rebar checklist submitted, Tower A L12 — Conduit laying complete, 2F east wing Want more detail on any of these, or should I send a reminder or check a due date with the team?
09:00 ✓✓
Delivered automatically, every morning

Why project control breaks down

Every one of these was reported. Every one still slipped.

Track the work, prove it happened, get the report out — three jobs, and the only thing holding them together is someone doing it by hand.

Tracking the work

One blocker. Three fronts stall behind it.

A carpenter shortage holds up formwork on 3F. Formwork slips, so shuttering slips behind it, so the pour crew — geared up and ready — has nothing to pour into.

Three days pass before anyone connects the dots. One blocker, mentioned once in one group, quietly stalled three fronts behind it.

Proving it happened

Inspected and cleared. Try proving it happened.

QC clears the rebar for the 3F pour — a photo and a thumbs-up reply from the site engineer. Work proceeds the same day, exactly as it should.

It's the only record — never filed to the project folder. The billing engineer needs it for the bill, and the project engineer goes hunting for it in chat.

Getting the report out

Due by 9 AM. Still collating messages by hand.

Wednesday's DPR and DLR are due by 9 AM. Thirty-odd messages sit across the two groups from overnight — photos, a voice note, headcounts in three formats — someone's typing it all up by hand.

It's ready at 9:40. The client's already called twice asking where it is.

You can keep that up on one project. Try it across five.

What we keep hearing

The more projects you run, the worse this gets.​

200 projects. Leadership flying blind.

We're running 200 projects. Leadership needs to see what's happening on the ground to make decisions — right now, that visibility just isn't there.
Contractor200+ Projects Portfolio

Promised in the meeting. Vanished after.

The firm's single biggest bottleneck is commitment disappearance — promises made but never tracked, verified, and closed.
Firm PrincipalArchitecture, Design & Construction

Across 19 groups. Problem noticed next day.

Someone flags a problem in one group. I'm across nineteen. Noticed next day. Only if I had all blockers across groups collated in one place.
Senior Project ManagerResidential & Commercial GC

In 20 site groups, still can’t hold subs to deadlines.

I'm on WhatsApp groups for all 20 sites. I still can't tell, who was behind on what this week. Unable to hold my subs to deadlines effectively.
Business OwnerConstruction & Warehousing

The Fix

Every update — captured, structured, and flagged — without anyone changing how they work.

Before
Ravi · Site Engineer
crane operator absent, pour on hold
6:42 PM ✓✓

One message. Twenty groups. Nobody connects it.

After
Blocker
Tower B – 3F Slab
Crane operator absent — pour on hold, 2 days.
Escalated to Site PM · tracked to resolution

Flagged, owned, tracked — automatically.

How it works

One WhatsApp QR Scan. Zero Change for Your Teams.

Add Velora to your existing WhatsApp groups. Your teams keep working exactly as they do — the same whether you connect one project or twenty.

01
Capture

Captures every update your teams already send

Connect Velora to your existing WhatsApp groups. Messages, voice notes, photos — captured as they happen.

02
Extract

Every update is structured automatically

Progress, blockers, commitments, deliveries, inspections, attendance — all structured automatically.

03
Analyze

Issues and blockers surfaced immediately

Updates cross-referenced across every group. Issues and action items followed through to closure.

04
Surface

Flagged the moment it needs your attention

Blockers flagged for review. Deliveries and inspection records ready to find — before anything reaches billing.

Data Sources

WhatsApp Messages
Voice Notes
Photos & Scans

Involved Parties

GCSpecialty TradesPMCs
Velora

Velora AI

Capture
Extract
Analyze
Surface

What You Get

Progress logged automatically, every day
Blockers escalated before they compound
Inspections logged, NCs followed through
Commitments tracked to closure
Deliveries logged, easy to find later

What Velora Delivers

Project intelligence — without changing how your teams work.

Site Visibility

Every work front — health, progress and blockers — on every project.

Each work front summarised with a health status, progress, blockers & commitments, structured from your group messages. Every project reports the same way, so you can scan across all of them instead of calling each PM — the same summary also lands as a daily pulse on WhatsApp, so you don’t even have to open the dashboard to get it.

Project · Site View
Sunridge Phase II
At Risk
Live
Work Front Health
0
1 at risk · 2 behind · 3 on track
Status
Blockers
0
3 blocking · 2 hold points
Type
Overdue
0
3 issues · 2 late starts · 1 action
Breakdown
Work FrontIssuesBlockedUpdated
Tower B – 3F Slab
32Today
2 blockers4 targets behind
Tower A – 4F Columns
21Today
1 RFI open2 behind
Block B – Core & Stair
12Today
2 blockers1 NCR open
Tower A – 3F Finishing
——Today
On track
Podium – Level 2
——Today
On track
Basement – Zone C
——Today
No targets set
Pulse→ Rohan · Project Manager

Focus today: — 3F slab pour quality checklist not received — 2h — Panel board testing confirmation pending — 6h Yesterday: — 3F slab pour complete, photos logged — Conduit laying complete, 2F east wing Want more detail on any of these, or should I send a reminder or check a due date with the team?

09:00 ✓✓
What's blocking work
5 open · oldest first
Shuttering material not delivered — Tower B 3F work stopped
HindranceTower B – 3F Slab
needed by 22 Jun
5d
open
MEP clearance blocked — 3 open RFIs unresolved
RFITower A – 4F Columns
4d
open
Crane operator absent — slab pour on hold, 2 subcons idle
HindranceTower B – 3F Slab
needed by 23 Jun
2d
open
RCC inspection hold-point B5 — clearance pending
InspectionBlock B – Core & Stair
needed by 24 Jun
2d
open

Report Drafts

Progress and manpower reports — auto-drafted.

Progress updates, photos, measurements, and headcounts pulled from your group messages into each report format. Review and confirm in under 5 minutes — not compile from scratch.

Daily Progress ReportDOCX
Report #042·Greenfield Heights·Apr 6, 2026
Report highlights
🟢 Site health: On track⚠️ 2 critical · 3 medium👷 202 workers (↑12 vs yesterday)📦 1 shortage · 🛠️ 1 downtimeMilestone: T3 slab due in 3d

Executive summary: pours on schedule; crane and conduit tracked under Issues with owners.

Progress by Workfront
WorkfrontActivityStatus
T1 · F3–F5Plastering✅ Completed
T2 · F4Brickwork✅ Completed
T3Slab casting🔄 In progress
T2 · F8Shuttering📅 Planned
PodiumWaterproofing⏸ Delayed
Issues & blockers
IssueSev.OwnerStatus
Crane breakdown — T2🔴 Crit.PMOpen
Electrical conduit — material shortage🟡 Med.Site Eng.Open
Manpower — 4 masons short (T4 F3)🟡 Med.PMOpen
RFI: waterproofing spec🔵 LowQCPending
Prepared by · Reviewed by · Approver · Velora AI
Daily Manpower ReportXLSX
202 workers1,616 man-hours8h shift · Apr 6, 2026
LocationVendorSupervisorTradeWMH
T1 F4ABC CementsL. DasHelper45360
T1 F4ABC CementsR. DasCarpenter56448
T1 F3ABC CementsI. ShaikMason38304
T2 F2MEP ProA. KhanElectrician28224
PodiumSealCo—Fitter22176
GateSecureFenceP. RaoWelder13104
Total2021,616

Commitment Tracking

Issues, action items and daily update follow-ups and reminders — done automatically, fully in your control.

Velora messages the right person directly on WhatsApp — nudging for a DPR update at day's end, following up on issues that haven't moved, and checking in on action items before they're overdue. You decide what gets a follow-up — turn any of it off per project, per person, or altogether.

Tower B · DPR
Ravi, John, Greg, Velora +5
Greg
3F formwork stripped, ready for pour tomorrow ✓
4:52 PM
DPR Reminder→ Ravi · Site Engineer
⏰ Your DPR update is due. Send today's progress. Any blockers?
5:00 PM ✓✓
Ravi
On it, sending now 👍
5:01 PM
John
Crane operator still not back, pour on hold since morning
5:02 PM
Issue Follow-Up→ Site PM
Issue still open 2 days — "Crane operator absent, pour on hold." Any update on resolution?
5:04 PM ✓✓
Site PM
Relief operator arranged, resuming tomorrow AM.
5:05 PM
Action Item Follow-Up→ MEP Engineer
Is this action item completed — "Push MEP engineer to close 3 open RFIs"? Due today.
5:08 PM ✓✓

The impact

The operational shifts that happen from week one.

No morning scroll. Blockers caught before they cost you. Reports that draft themselves. These are the shifts managers notice first.

What changes when nothing has to be reconstructed, chased, or rediscovered later.

No morning scroll

Start your day with signal, not scroll

Before your first call you're already spending 20 minutes scrolling back through groups to reconstruct what happened overnight. Velora surfaces what matters — progress flagged, issues open, action items outstanding — without the scroll.

Catch it before it slips

Blockers tracked to closure, not lost in the thread

A blocked work front starts as a single WhatsApp message. Flagged and tracked until it's resolved — not left buried in a thread nobody revisits.

2-3 hours back, every Friday

Progress and manpower reports draft themselves

Velora drafts your progress and manpower reports from the week's group messages — work front by work front, issue by issue. Review and confirm in minutes.

Hold-points flagged early

Inspection gates caught as they happen — not at handoff

A hold-point logged in the group — rebar ready, slab poured, pending sign-off — is flagged the moment it happens, not rediscovered when the next trade is blocked or at handoff.

You can run two projects from the group chats. Not ten.

The work stays on WhatsApp. What doesn't scale is compiling the picture by hand — every project you add is another set of updates to chase and another report to write. Velora is the layer that keeps up. Request a pilot and we'll set it up on your live projects and existing groups, so you see it working on your own site data.

Frequently Asked Questions

Common questions from construction managers who've seen PM tools fail before.

No. Your site teams keep using WhatsApp & documents exactly as they do today. Velora reasons across fragmented data sources — no new apps, no forms, no training. It also works in the language your teams are most comfortable in: English, Hindi, Telugu, Spanish, Arabic and more.

Velora connects to your groups through existing WhatsApp number (no business API needed) — one number or multiple. We recommend getting separate project-specific numbers though for privacy & enhanced functionality. Every message is processed to extract structured project data — progress, issues, commitments, inspections, and deliveries. Nothing changes for your site teams.

Velora is built for the construction manager accountable for delivery — a project manager in a large GC, a site engineer managing an infra stretch, an owner-operator running fit-out, prefab, or specialty contractor sites, or an HO leader overseeing multiple projects across a GC or specialty contracting firm. If you're coordinating work across multiple WhatsApp groups and managing subcontractors, Velora is for you.

Both. Every project is structured the same way — work fronts, progress, blockers, commitments, inspections, deliveries — so whether you're running one site or fifteen, they all report into the same format.

You see each project on its own, and you can scan across all of them without a call to every PM. The manual work of compiling and comparing is what goes away as you add projects — not the PM on each site.

Velora extracts from whatever is in the groups from day one — structured or not.

As you see project records building automatically from group messages, you'll naturally start directing site teams to share updates in the group rather than over calls or walk-ins.

Your site teams already prefer WhatsApp — and when sharing in the group saves them the effort of a separate call, they adopt without being asked.

No — it makes it automatic. Your DPR format stays the same. Velora drafts it from the day's group messages. You review and confirm before it goes out. The process is the same; the compilation burden goes away.

Velora connects to as many groups as your project needs. All outputs are consolidated into one project view — without reading each group separately.

Site teams keep sharing updates exactly like they do today — no new step required. If they mention the work front in their message — 'House 12 plastering done' — Velora matches it against your project's work front structure and associates the update automatically.

If a work front isn't mentioned, Velora still logs the update and tracks the location wherever it's referenced elsewhere in the conversation.

If a team keeps missing or misnaming work fronts, one easy fix: Velora generates a QR code for each work front. Print it and stick it at the location — House 7, Block B Level 3, whatever the work front is. Site teams scan the code, WhatsApp opens with the location pre-filled, they type their update and send. On a project with 50 houses, that's 50 QR codes placed once at setup — after that, every scan-and-send lands in exactly the right place.

PM tools ask site teams to change how they work. Site teams go back to WhatsApp within weeks because it's faster and already on every phone. Velora works on top of WhatsApp — not instead of it. Site teams change nothing. Project control builds itself from what they're already saying.

See how Velora compares to Procore, Buildertrend, Fieldwire, and task apps →

We run a discounted pilot for the first three months — full product, no long-term commitment. See what it surfaces on your own projects before committing to a subscription.

It starts with a short onboarding call to make sure Velora fits how your project runs. From there, we work with your team to align on and upload your project's work front structure, connect your WhatsApp groups, and set up contact roles — then you're live. Your site teams change nothing about how they work.

Yes. Data is stored securely with role based access control, and privacy data is encrypted at rest using AES-256 standard.