Stop chasing site for the record at bill time. Every day of work, hindrance and delivery, on record.

Velora turns the WhatsApp messages, voice notes and photos your site teams already send into one site record: progress, hindrances and manpower by location, deliveries by vendor with their challans, and diesel by machine. Your bills, claims and vendor checks are built from it, and delays reach the people who can act the same day.

One record for bills and claims. Progress, hindrances and manpower by location, feeding your RA bills, claims and the reports for clients and leadership.
Check every vendor bill. Deliveries by vendor with their challans, and diesel by machine, ready to check vendor and plant-hire bills against.
Package 2 · Site Updates
Suresh, Vijay, Imran +5
Suresh
DBM laying completed 46+100 to 46+400 RHS
4 photos
6:40 PM
Vijay
Electric poles still not shifted at 47+200, work stopped
7:15 AM
Package 2 · Stores
Ramesh +3
Ramesh
20 mm aggregate received, 3 tippers, 72 MT
Weighbridge slips, royalty papers
11:20 AM
Ramesh
JCB 0420 diesel 60 L, hour meter 1,284
5:05 PM
+6 More Groups
Velora
Progressvs scope
2 updates · matched
DBM · 300 m
46+100–46+400 RHS · 4 photos
Delineators · 18 nos
46+100–46+400 RHS
Open Issueshindrance
2 open · 1 hindrance
Electric poles not shifted
47+200 · work stopped · today
Subgrade caved in again
44+950 RHS · second time
Deliveriesby vendor
2 received · 1 to check
20 mm aggregate · 72 MT
Shiv Stone Crusher · weighbridge slips
10 mm aggregate, 1 load
Quantity not stated
Consumptionlitres
Diesel · by machine
JCB 0420
60 L · 1,284 hrs
Tipper 2214
85 L
Rohan · Project Manager
Project Pulse
Work moved on two fronts yesterday; one hindrance is holding the stretch at 47+200. Focus today: - Electric poles still not shifted at 47+200; work stopped since this morning Follow up: - Subgrade caved in again at 44+950 RHS, the second time on this stretch Yesterday: - Progress: DBM laying completed 46+100 to 46+400 RHS - Inspections: level check cleared, 46+100 to 46+400 RHS Want more detail on any of these, or should I send a reminder or check a due date with the team?
09:00 ✓✓
Delivered automatically, every morning

Where the site record breaks down

Every one of these was reported. Every one still slipped.

The inspection, the hindrance and the load were all posted. None of it reached a record a bill or a claim could be built from.

Proof for the bill

Inspected and cleared. Try proving it happened.

QC clears the DB panel test on Level 4 — a photo and a thumbs-up reply from the site engineer. Work proceeds the same day, exactly as it should.

It's the only record — never filed to the site folder. The billing engineer needs it for the bill, and the project engineer goes hunting for it in chat.

Record for the claim

Flagged once in the BBS group. Never in the hindrance register.

The barbending supervisor posts it: the client's nominated subcontractor still hasn't cleared the yard. One message among seven WhatsApp groups.

When the EOT is claimed, the hindrance has no entry to back it.

Loads behind the vendor's bill

"One truck of 10 mm came." The vendor bills in tonnes.

Posted in Hindi with a photo and no slip, between progress updates. On one road project, most of a month's aggregate loads arrived this way.

At month-end, the vendor's bill is checked against loads nobody weighed.

You can keep that up on one site. Try it across five.

What we keep hearing

The more sites you run, the worse this gets.​

200 projects. Leadership flying blind.

We're running 200 projects. Leadership needs to see what's happening on the ground to make decisions — right now, that visibility just isn't there.
Contractor200+ Projects Portfolio

Promised in the meeting. Vanished after.

The firm's single biggest bottleneck is commitment disappearance — promises made but never tracked, verified, and closed.
Firm PrincipalArchitecture, Design & Construction

Across 19 groups. Problem noticed next day.

Someone flags a problem in one group. I'm across nineteen. Noticed next day. Only if I had all blockers across groups collated in one place.
Senior Project ManagerResidential & Commercial GC

In 20 site groups, still can’t hold subs to deadlines.

I'm on WhatsApp groups for all 20 sites. I still can't tell, who was behind on what this week. Unable to hold my subs to deadlines effectively.
Business OwnerConstruction & Warehousing

The Fix

Every update captured and structured, the ones that matter flagged, without anyone changing how they work.

Before
Ravi · Site Engineer
riser valve leaking, pump room flooding
6:42 PM ✓✓

One message. Twenty groups. Nobody connects it.

After
Blocker
Basement – Pump Room
Riser valve leak — pump room flooding, 2 days.
Escalated to Site PM · tracked to resolution

Flagged, owned and tracked, for your team to act on.

How it works

One WhatsApp QR Scan. Zero Change for Your Teams.

Add Velora to your existing WhatsApp groups. Your teams keep working exactly as they do — the same whether you connect one site or twenty.

01
Read

Captures every update your teams already send

Connect Velora to your existing WhatsApp groups. Messages, voice notes, photos — captured as they happen.

02
File

Every update read and filed, for your team to review

Progress, blockers, commitments, deliveries, material and fuel consumption, inspections, attendance — each read and filed by site and work front as updates arrive.

03
Check

Issues and blockers surfaced immediately

Updates from every group checked together. Issues and action items followed through to closure.

04
Flag

Flagged the moment it needs your attention

Blockers flagged for review. Know what arrived on site, by vendor, every day. Inspection records ready to find.

Data Sources

WhatsApp Messages
Voice Notes
Photos & Scans

Involved Parties

GC & EPCInfra & UtilitiesSpecialty TradesPMCs
Velora

Velora AI

Read
File
Check
Flag

What You Get

Progress logged as work happens, every day
Blockers escalated before they compound
Inspections logged, NCs followed through
Commitments tracked to closure
Deliveries logged by vendor, every day

What Velora Delivers

One site record — without changing how your teams work.

Site Visibility

Every work front — health, progress and blockers — on every site.

Each work front summarised with a health status, progress, blockers & commitments, structured from your group messages. Every site reports the same way, so you can scan across all of them instead of calling each PM — the same summary also lands as a daily pulse on WhatsApp, so you don’t even have to open the dashboard to get it.

Site View
Sunridge Phase II
At RiskLive
Work Front Health
6
1 at risk · 2 to watch · 3 on track
Status
Blockers
5
3 blocking · 2 hold points
Type
Overdue
6
4 issues · 2 actions
Breakdown
Work FrontIssuesBlockedUpdated
Tower B – 3F Slab
31Today
1 blocker1 hold point
Tower A – 4F Columns
21Today
1 RFI open2 issues open
Block B – Core & Stair
12Today
2 blockers1 NCR open
Level 2 – HVAC Ducting
——Today
On track
Podium – Level 2
——Today
On track
Basement – Pump Room
11Today
1 blocker
Pulse→ Rohan · Project Manager

Focus today: — Level 4 DB panel test checklist not received — 2h — Panel board testing confirmation pending — 6h Yesterday: — 3F slab pour complete, photos logged — Conduit laying complete, 2F east wing Want more detail on any of these, or should I send a reminder or check a due date with the team?

09:00 ✓✓
What's blocking work
5 open · oldest first
Shuttering material not delivered — Tower B 3F work stopped
HindranceTower B – 3F Slabneeded by 22 Jun
5d
open
MEP clearance blocked — 3 open RFIs unresolved
RFITower A – 4F Columns
4d
open
Riser valve leak — pump room flooding
HindranceBasement – Pump Roomneeded by 23 Jun
2d
open
RCC inspection hold-point B5 — clearance pending
InspectionBlock B – Core & Stairneeded by 24 Jun
2d
open

Report Drafts

Progress and manpower report drafts, ready to review.

Progress updates, photos, measurements, and headcounts pulled from your group messages into each report format. Review and confirm in under 5 minutes — not compile from scratch.

Daily Progress ReportDOCX
Report #042·Greenfield Heights·Apr 6, 2026
Report highlights
🟢 Site health: On track⚠️ 2 critical · 3 medium👷 202 workers (↑12 vs yesterday)📦 1 shortage · 🛠️ 1 downtimeInspection: T3 slab rebar sign-off pending

Executive summary: pours progressing; crane and conduit tracked under Issues with owners.

Progress by Workfront
WorkfrontActivityStatus
T1 · F3–F5Plastering✅ Completed
T2 · F4Brickwork✅ Completed
T3Slab casting🔄 In progress
T2 · F8Shuttering📅 Planned
Level 2Chilled water piping✅ Completed
Issues & blockers
IssueSev.OwnerStatus
Crane breakdown — T2🔴 Crit.PMOpen
Electrical conduit — material shortage🟡 Med.Site Eng.Open
Manpower — 4 masons short (T4 F3)🟡 Med.PMOpen
RFI: waterproofing spec🔵 LowQCPending
Prepared by · Reviewed by · Approver · Velora AI
Daily Manpower ReportXLSX
202 workers1,616 man-hours8h shift · Apr 6, 2026
LocationVendorSupervisorTradeWMH
T1 F4ABC CementsL. DasHelper45360
T1 F4ABC CementsR. DasCarpenter56448
T1 F3ABC CementsI. ShaikMason38304
T2 F2MEP ProA. KhanElectrician28224
PodiumSealCo—Fitter22176
GateSecureFenceP. RaoWelder13104
Total2021,616

Deliveries by Vendor

Every load on record, with its challan, ready to check the vendor’s bill.

Challans, weighbridge slips and royalty papers posted in the store and site groups are read, and each delivery is recorded by supplier, material and quantity with its papers. A deliveries report by vendor goes out daily, weekly or monthly; your team checks each vendor’s bill against it.

Store · Receipts
Highway Package 2 · Ramesh, Velora +3
Ramesh
20mm from Shakti Aggregates, slip and royalty paper attached
2 photos
11:20 AM
Plant · Site
Manoj, Velora +6
Manoj
एक गाड़ी 10mm आया
1 photo
12:05 PM
Accounts · Purchase
Kavita, Velora +2
Kavita
Emulsion invoice from Ganga Bitumen, 2 MT, vehicle reached plant
Invoice photo
3:40 PM
+4 More Groups
Velora
Material Deliveries Report · Summary sheetExcel
20 mm aggregate · Shakti Aggregates412.6 t
14 deliveries; on the Deliveries sheet, each with its slip number and net weight
Slip 2163 · net 29.8 tRoyalty paper on the Permits sheet9 Oct29.8 t
Slip 2187 · net 31.4 tRoyalty paper on the Permits sheet14 Oct31.4 t
Slip 2251 · net 30.6 tRoyalty paper on the Permits sheet22 Oct30.6 t
PayIn the deliveries report by vendor
10 mm aggregateNot stated
"One truck of 10 mm came" · no slip, supplier not stated
PayListed as quantity not stated
Bitumen emulsion RS-12.0 t
Ganga Bitumen · from the invoice photo
PayIn the deliveries report by vendor
Anita · Accounts
Weekly report
Weekly Material Deliveries Report
Hi Anita, here's the Weekly Material Deliveries Report for Oct 27 - Nov 2, 2026 — everything recorded up to the end of Mon, Nov 2.
Highway Package 2 Material Deliveries Report (Oct 27 - Nov 02, 2026).xlsx
9:00 AM ✓✓
Sent on WhatsApp or email, daily, weekly or monthly

Diesel by Machine

Every litre on record, by machine, against the hours or kilometres it ran.

Fills from the site tank, the pump and petty cash are read from log sheets, pump slips and report lines and filed against the right machine with its meter reading, so a machine using more than the rest shows up beside the others.

Plant · Machinery
Highway Package 2 · Chandan, Velora +5
Chandan
Diesel JCB 0420, 103.9 L, reading 2875.1 hrs, from the pump
Pump slip
8:40 AM
Package 2 · Site Updates
Sunil, Velora +8
Sunil
Diesel today: Excavator 1 50 L, Tipper 0079 30 L, DG 20 L
Log sheet
6:15 PM
Package 2 · Admin
Deepak, Velora +3
Deepak
Camper 4034 diesel 25 L from cash, reading 98,419 km
1 photo
6:48 PM
+3 More Groups
Velora
October fuel · Highway Package 2Updated 6:49 PM
JCB 0420 · diesel412 L
5 fills this month, each with its hour-meter reading · 4.8 L/hr against hours worked
Pump fillReading 2,790.6 hrs12 Oct98.4 L
Pump fillReading 2,833.2 hrs19 Oct104.6 L
Pump fillReading 2,875.1 hrsToday103.9 L
PayLitres set against hours worked
Tipper 6743 · diesel1.4 km/L
70 L for 40.5 km on 15 Oct; 1.4 km/L over the month, against 2.3 km/L for Tipper 0079
PaySide by side in the period summary
Camper 4034 · diesel25 L
From cash · reading 98,419 km · photo kept
PayIn the consumption report
Vijay · Plant In-charge
Weekly report
Weekly Material Consumption Report
Fuel consumption for Highway Package 2, 27 Oct to 2 Nov: every fill with its machine, reading and source, and totals by fuel type.
Highway Package 2 Material Consumption Report - Fuel (Oct 27 - Nov 2, 2026).xlsx
9:00 AM ✓✓
Sent on WhatsApp or email, daily, weekly or monthly

Commitment Tracking

Issues, action items and daily update follow-ups and reminders — done automatically, fully in your control.

Velora messages the right person directly on WhatsApp — nudging for a DPR update at day's end, following up on issues that haven't moved, and checking in on action items before they're overdue. You decide what gets a follow-up — turn any of it off per site, per person, or altogether.

Site Team · Daily Updates
Ravi, John, Greg, Velora +5
Greg
3F formwork stripped, ready for pour tomorrow ✓
4:52 PM
DPR Reminder→ Ravi · Site Engineer
⏰ Your DPR update is due. Send today's progress. Any blockers?
5:00 PM ✓✓
Ravi
On it, sending now 👍
5:01 PM
John
Crane operator still not back, pour on hold since morning
5:02 PM
Issue Follow-Up→ Site PM
Issue still open 2 days — "Crane operator absent, pour on hold." Any update on resolution?
5:04 PM ✓✓
Site PM
Relief operator arranged, resuming tomorrow AM.
5:05 PM
Action Item Follow-Up→ MEP Engineer
Is this action item completed — "Push MEP engineer to close 3 open RFIs"? Due today.
5:08 PM ✓✓

The impact

The operational shifts that happen from week one.

No morning scroll. Blockers caught before they cost you. Reports that draft themselves. These are the shifts managers notice first.

What changes when nothing has to be reconstructed, chased, or rediscovered later.

No morning scroll

Start your day with signal, not scroll

Before your first call you're already spending 20 minutes scrolling back through groups to reconstruct what happened overnight. Velora surfaces what matters — progress flagged, issues open, action items outstanding — without the scroll.

Catch it before it slips

Blockers tracked to closure, not lost in the thread

A blocked work front starts as a single WhatsApp message. Flagged and tracked until it's resolved — not left buried in a thread nobody revisits.

Reports drafted for you

Progress and manpower report drafts, daily, weekly or monthly

Velora drafts your progress and manpower reports from the group messages — work front by work front, issue by issue. You review and confirm instead of compiling them by hand.

Hold-points flagged early

Inspection gates caught as they happen — not at handoff

A hold-point logged in the group — rebar ready, slab poured, a DB panel tested, pending sign-off — is flagged the moment it happens, not rediscovered when the next trade is blocked or at handoff.

You can run two sites from the group chats. Not ten.

The work stays on WhatsApp. What doesn't scale is compiling the picture by hand — every site you add is another set of updates to chase and another report to write. Velora is the layer that keeps up. Request a pilot and we'll set it up on your live sites and existing groups, so you see it working on your own site data.

Frequently Asked Questions

Common questions from contractors who've seen site apps fail before.

No. Your site teams keep using WhatsApp & documents exactly as they do today. Velora reads what they already post across every group and document — no new apps, no forms, no training. It also works in the language your teams are most comfortable in: English, Hindi, Telugu, Arabic and more.

Velora reads whatever is in the groups from day one, however it's written.

As you see site records building from group messages, you'll naturally start directing site teams to share updates in the group rather than over calls or walk-ins.

Your site teams already prefer WhatsApp — and when sharing in the group saves them the effort of a separate call, they adopt without being asked.

When someone reports a blocker or commits to a date in a group, Velora logs it against the work front and the person responsible, and tracks it until it closes. Anything still open shows up in your PM's daily focus, so nothing depends on someone remembering to chase it. Velora doesn't message your groups by default. Follow-ups are off until you switch them on, and you choose where they go (every site, one site or one group) and what Velora asks about, such as missing details or due dates.

Yes. Velora drafts daily, weekly or monthly progress reports from the site record, for clients and leadership. Your PM reviews and confirms each one before it goes out.

Yes. Deliveries reported on site (challans, weighbridge slips and photos shared in WhatsApp) are logged by vendor and date, so you know what arrived on site, every day, and the vendor, source and challan behind each load are on record when the client checks royalty. It's a delivery record: it isn't matched to POs, invoices or payments.

Yes. Consumption reported in your groups (fuel loaded into each vehicle or generator, cement bags used, paint for road marking) is logged by date, material and the vehicle or place it went to, so your team can reconcile fuel and material costs, and exported to Excel daily, weekly or monthly. It's a record of what the site reports consuming: it isn't matched to stock systems, POs or invoices.

No — it takes the compilation off your hands. Your DPR format stays the same. Velora drafts it from the day's group messages. You review and confirm before it goes out. The process is the same; the compilation burden goes away.

Velora connects to as many groups as your site needs. All outputs are consolidated into one site view — without reading each group separately.

Site teams keep sharing updates exactly like they do today — no new step required. If they mention the work front in their message — 'House 12 plastering done' — Velora matches it against your site's work front structure and associates the update with it.

If a work front isn't mentioned, Velora still logs the update and tracks the location wherever it's referenced elsewhere in the conversation.

If a team keeps missing or misnaming work fronts, one easy fix: Velora generates a QR code for each work front. Print it and stick it at the location — House 7, Block B Level 3, a client's plant room, whatever the work front is. Site teams scan the code, WhatsApp opens with the location pre-filled, they type their update and send. On a site with 50 houses, or a rate contract covering 50 client sites, that's 50 QR codes placed once at setup — after that, every scan-and-send lands in exactly the right place.

We run a discounted pilot for the first three months — full product, no long-term commitment. See what it surfaces on your own sites before committing to a subscription.

Yes. Data is stored securely with role based access control, and privacy data is encrypted at rest using AES-256 standard.