Stop chasing packages for quantities at month-end. Bill what's built, claim every hold-up.

An office, mall or hotel runs structure, facade, MEP and fit-out at once, each package and subcontractor posting in its own group, so the month's quantities and test records wait on reports pieced together at month-end. Velora reads every group and files each update by floor and zone. No new app for site teams.

BillEvery package's work on this month's bill. Each total, per BOQ item or work scope line, carries the floors and zones behind it, with photos, inspection records and test results.
ClaimContract triggers caught the same day. A floor not handed over by another package, an instruction from the architect, a late drawing reported by site: each matched to the clause it may trigger while there's time to raise it.
PayEvery delivery accounted for. Steel, glazing, ducting, cable and fit-out material by vendor, with challans, so each vendor bill is checked against what arrived.
Facade · Package 3
Harbour One · Sameer, Velora +6
Sameer
Glazing units fixed L6 east elevation, 42 nos
3 photos
5:40 PM
Facade · Site Engineers
Vivek, Velora +4
Vivek
L7 slab still not handed over by structure team, crew on standby again
2 photos
5:55 PM
Site · Stores
Ramesh, Velora +3
Ramesh
Ducting sheets received, 2.4 MT, Airtech, challan attached
Challan
6:15 PM
+8 More Groups
Velora
October · Harbour OneUpdated 6:16 PM
Glazing units · East elevation168 nos
4 floors this month, each with its units, photos and inspection
L4 · EastInspection signed13 Oct44 nos
L5 · EastInspection signed21 Oct44 nos
L6 · EastInspection pendingToday42 nos
BillOn this month's bill
L7 slab handover · Structure9 days late
Facade crew waiting since 18 Oct · posted daily
ClaimDelay by another party flagged
Ducting sheets2.4 MT
Airtech · challan kept
PayIn the deliveries report by vendor
Facade · QC
QC Team, Velora +4
Inspection Pending
L6 east glazing fixed today, 42 units. Please share the signed inspection record before the bill cut-off.
6:20 PM ✓✓
Karthik · Project Head
Contract alert
Potential Entitlement
L7 slab not handed over to the facade package for 9 days. This may be a delay by another contractor under the contract; notice window tracked from 18 Oct. Keep the daily posts until the slab is handed over.
6:18 PM ✓✓
Sent on WhatsApp, the day it's detected

What slips at month-end

Many packages, one building. Each reporting on its own.

A commercial project runs structure, facade, MEP and fit-out at once, each package in its own group. Nothing is totalled until month-end, so small things slip: work done that missed the bill, tests nobody filed, hand-overs nobody put on record, loads nobody can trace.

Missed in the bill

612 light fixtures fitted this month. 590 reached the bill.

"L5 zone B lights fixed, 48 nos": a zone at a time, from the electrical subcontractor, one post among hundreds.

At month-end someone counts them back from scroll-back, and a zone or two is missed. The lights are on; the bill never saw them, so they wait for next month.

Tests

Piping pressure-tested. The report never reached the bill.

Fire and chilled water piping is pressure-tested before the ceiling closes, and the signed report is photographed into whichever group is nearest.

Where the client wants it with the bill, the billing engineer looks for each report across groups at bill time. Lines without one wait for next month.

Hand-overs

The slab came late. Nobody recorded who waited.

The facade crew stood down for nine days, waiting for a slab from another package. Site posted it every day; nobody logged when it started.

When time is argued, the record is a scroll, and the notice window has closed.

Material cost

Glazing, ducting and cable from a dozen vendors. Challans everywhere.

Each package receives its own material, each load with a challan photographed into whichever group is nearest.

At month-end each vendor bill is checked against challans nobody can find, so it gets paid as billed.

None of it is a big miss. Across packages and floors, it adds up.

What Velora picks up

What your site groups already carry, in building terms.

Velora reads text, voice notes and photos in the groups your teams and package subcontractors use today, and files each update by floor and zone.

  • Progress by location

    Structure, facade, MEP and fit-out by floor and zone, with photos.

  • Tests and inspections

    Pressure tests, inspection records and cube tests, filed against the work they prove.

  • Deliveries

    Steel, glazing, ducting, cable and fit-out material by vendor, with their challans.

  • Hand-overs and hindrances

    Floors not handed over between packages, material held, work stopped, with the floor or zone each one holds.

  • Instructions

    Instructions from the client's engineer, architect or PMC, logged with date and location.

  • Repairs

    Rework and repairs reported on site, with photos, so a repeat repair shows up.

  • Manpower

    Crews on site, by package and trade.

  • Commitments

    Who promised what, by when: a hand-over, a test, a delivery.

Site teams change nothing. Velora joins each group as one more member.

What each team gets

Every team gets its part of the project.

Billing gets the month's quantities in a report, contract triggers reach whoever you choose, project heads see every package today, and leadership sees every project. Nobody has to ask site for an update.

Billing Intelligence

This month's quantities, ready for the bill.

Work done is matched to your BOQ or work scope and totalled for the month. Each total opens into the floors, zones, dates and photos behind it, with the inspection records and test results it needs, and missing ones are followed up on WhatsApp once you switch follow-ups on. Velora tracks quantities; your team adds rates and finalises the bill.

See Billing Intelligence
Contract IntelligenceEarly access

The contract triggers that are easy to miss.

Not just EOT and LD. A floor not handed over by another package, but also an instruction from the architect, extra work beyond the scope or a late drawing reported by site: each is logged with its location and the date it was first posted, matched to the clause it may trigger, and whoever you choose is alerted the same day, whether that's site, project controls or your contracts specialist, then reminded before the notice window closes. Your team decides what goes to the client.

See Contract Intelligence
Field Intelligence

Every package, every day, without the calls.

Progress by floor and zone, the hand-overs and hindrances holding each package, deliveries by vendor and commitments followed up, from the groups your teams and subcontractors already post in. Daily, weekly or monthly reports are drafted from the same record, ready to review and send to your client or PMC.

See Field Intelligence
Portfolio Intelligence

Every project in one view.

For the MD or project controls head running several projects: the blockers that have waited longest for a decision, by package, and, where Billing is on, which quantities are still waiting on proof.

See Portfolio Intelligence

Worked example

The month's bill, built from the site record.

Commercial work is billed per BOQ item or work scope line, package by package. Velora keeps each total and its proof together.

  • Totals per scope line

    Numbers of glazing units and fixtures, metres of piping and cable, square metres of partitions and finishes, for each BOQ item or work scope line.

  • By floor and zone

    Every total lists where the work was done, with dates and photos, so your engineer can check it before it goes to the client.

  • Tests and inspections per line

    Pressure tests and inspection records, received or still missing, before the bill goes out.

  • Gaps before the bill

    Work done that matches no BOQ item, and BOQ items posted without a measurement, flagged to your billing team before the bill goes in.

October bill · Harbour One
Prepared from the site record
For your billing engineer to review
Scope lineOctoberWhere and whatDocuments
Glazing units · East elevation168 nos4 floors · 31 photosDocuments: Inspection missing
L3 · East38 nos6 Oct
L4 · East44 nos13 Oct
L5 · East44 nos21 Oct
+1 more · L6, inspection pending
Chilled water piping · L2–L41,240 m3 floors · 26 photosDocuments: Test report missing
Light fixtures · L1–L5612 nos14 zones · 40 photosDocuments: All in
Gypsum partitions · L3–L62,380 sqm6 zones · 35 photosDocuments: All in
Velora tracks quantities. Your team adds rates and finalises the bill.

Illustrative figures

Getting started

What we'd need to start a pilot.

A pilot runs on one project and its live site groups. Your site teams don't change how they post.

  1. A spare WhatsApp number

    Linked to Velora and added to your site groups as one more member. No personal chats are connected.

  2. Your site groups

    The groups where progress, tests, deliveries and hand-overs are posted today, including each package's groups.

  3. Your scope

    The BOQ or work scope, and the building's floors and zones. Loaded once.

A sample chat export lets us test on your own messages before going live.

See it on your own project.

Talk to us about your project and we'll set up a pilot against its live WhatsApp groups and your BOQ or work scope.

Frequently Asked Questions

Common questions from commercial project heads and billing engineers.

Yes. Scope is loaded from the document that holds it, an item-rate BOQ or a lump-sum billing break-up, and work done is matched to its lines and totalled for the month, with the floors and zones behind each total. Billing by stage or milestone is something the team is still working on. Velora tracks quantities; your team adds rates and finalises the bill.

No. Velora reads every package's groups the same way and files each update against the floor or zone it names, so structure, facade, MEP and fit-out report into one record. A hand-over that holds another package is logged with the date it was first posted.

Yes. Velora reads text, voice notes and photos in the languages your teams use, including photos of test reports, inspection records and challans, and keeps each original message with the record it created.

Yes. Daily, weekly or monthly reports are drafted from the site record, by floor and package with photos, for your team to review before they go out.

No. EOT and LD are the clauses every team watches. Velora also checks routine updates against the rest of your contract: a hand-over delayed by another package, an instruction from the architect, extra work beyond the scope or a late drawing reported by site, each matched to the clause it may trigger, with the deadline and the record behind it. Whoever you choose is alerted the same day. Velora doesn't send notices; your team decides what to send. Contract Intelligence is in early access.

We run a discounted pilot for the first three months on one project: the full product, with no long-term commitment.