Skip to main content

Stop piecing each change together from the group. Back every variation. Bill what's built.

48 hoursTo state the time and cost of a change under one fit-out's work order, or it's deemed accepted.

The client's design team changes the scope in the group and asks for photos and manpower most days. Velora reads your site and client groups and files each update by floor.

BillWork done on each running bill. Partitions, false ceiling, flooring and electrical matched to your BOQ lines by floor, with the photos site posted.
ClaimEarly accessEvery change the client asks for, backed and ready to raise. Each instruction from the client's design team, checked against your scope and packaged with its dated photos. A drawing awaited or an area not handed over is logged with its date and place, ahead of a fixed handover.
PayEvery delivery accounted for. Tiles, boards, wiring and fittings from many small vendors, with their challans, so each vendor bill is checked against what arrived.

No new app for site teams.

A fixed handover date. And a change every week.​

Instructions, hold-ups and deliveries land in the same busy groups, and the proof is pieced together by hand.

Bill

Site posts framing, ply and gypsum. The BOQ has one partition line.

  1. Work done
  2. Matched to scope (breaks here today)
  3. Proof
  4. On this month’s bill

"Framing done", "ply finishes today", "gypsum from tomorrow": site reports a partition in stages. At each running bill, someone works out by hand how much of the BOQ line is done.

Claim

Seven possible scope changes in five weeks.

  1. Client instruction
  2. Work done
  3. Proof (breaks here today)
  4. Raised for approval

The work order gives you 48 hours to state the time and cost of a change, or it's deemed accepted. The proof for one flooring change sat across two WhatsApp groups, email and two drawing revisions.

Claim

The handover date is fixed. The hold-ups behind it aren't on record.

  1. Event on site (breaks here today)
  2. Clause it may trigger
  3. Notice window
  4. Raised on time

Kitchen drawings asked for on 18 Oct, the full set shared on 6 Nov. First-floor marking held from 17 Oct until the tiles were ordered on 3 Nov. If the handover slips, the dates are pieced back together from scroll-back.

Pay

Tiles, boards and wiring from many small vendors. Challans everywhere.

  1. Delivery
  2. Slip or challan
  3. Tracked by vendor (breaks here today)
  4. Checked against the vendor’s bill

The tiles came with a challan photo, the ply with none, the wire in 90 m bundles against 100 m ordered. Each vendor bill is checked against posts nobody can find, so it gets paid as billed.

None of it is a big miss. On a small job with a fixed date, it adds up.

Every team gets its part of the project.​

Nobody has to ask site for an update.

BillFor billingBilling & certification

Work done, ready for each running bill.

Work done is matched to your BOQ lines by floor and totalled, with the photos behind each line. Your team sets the rates and finalises the bill. The documents your team marks due are followed up on WhatsApp once you switch follow-ups on.

Explore Billing & certification
ClaimFor project headsVariations & claimsEarly access

Variations backed with their proof.

Each change the client's design team asks for is checked against your scope and packaged with the work and its dated photos, for your team to price and raise. Hold-ups site reports, such as a drawing awaited or an area not handed over, are logged with their date and place, so the record is there if the handover date is questioned.

Explore Variations & claims
PayFor purchase and accountsVendor bills

Check every vendor bill.

Deliveries by vendor, with their challans, so your team can check each vendor bill against what arrived before paying.

Explore vendor bills
Across projectsFor the MD, across every storeMulti-project dashboard

Every project in one view.

The blockers that have waited longest for a decision and, where billing is set up, how many bill documents are still owed.

Explore Multi-project dashboard
Site record

Your client's daily asks, answered from the record.

What your site and client groups already carry, in fit-out terms.

Velora reads text, voice notes and photos in the groups your team, your subcontractors and your client use today, and files each update by floor.

  • Progress by location

    Partitions, false ceiling, flooring, electrical and finishes by floor, with photos.

  • Deliveries

    Tiles, boards, wiring and fittings by vendor, with their challans.

  • Instructions and changes

    Client inspections, and changes of scope the client's design team asks for, logged with who asked, the date and the location.

  • Samples shared

    Samples shown to the client's design team, with their reply and the date.

  • Hold-ups

    Drawings awaited, samples not approved, areas not handed over, with the floor it's reported at.

  • Manpower

    Crews on site by trade, from the headcounts site posts.

  • Repairs

    Rework and repairs reported on site, with photos.

  • Commitments

    Who promised what, by when: a drawing, a sample, a delivery.

On one fit-out, the client's team asked for updates, photos or the manpower count on 17 of 30 days. Daily and weekly progress reports with photos, and manpower reports from the headcounts site posts, come from the same record, the weekly one as a draft to review before it goes to your client.

Explore Site record

Site teams change nothing. Velora joins each group as one more member.

One change, packaged for your team to price.​

The first-floor flooring change from one fit-out, as a variation pack. In early access, our team prepares it with yours from the site record.

Variation report · VR-01First-floor flooring: SPC to tiles
Early access
1Summary
Instruction
“That’s the tile from the vendor’s samples, right? Good to go.”
Instructed by
The client’s design team · 28 Oct, 1:25 PM · client group
Followed by
Quote for first-floor tiles asked 31 Oct · order placed 3 Nov
Scope
BOQ: vinyl flooring, first floor, 2,818 sq ft; no floor-tile quantity. The drawings show SPC.
Work done
113 boxes of tiles delivered 5 Nov · laid on the first floor by 10 Nov
Evidence
9 site updates from 2 WhatsApp groups · 12 photos
2Work record
DateSite team’s wordsPhotos
5 NovTiles delivered, 113 boxes, with the challan1–9
9 NovDaily report: tile laying in progress–
10 NovMost of the first floor tiled today, levels matched to the existing store10–11
10 NovTile laying done; cleaning, then floor protection12
3Quantity and value For your team
ItemQtyRateAmount
Floor tiles, first floor, in place of vinyl (SPC)From site updates: 113 boxes
4Photographs, in date order
Photo 1Photo 2Photo 3Photo 4Photo 5Photo 6Photo 7Photo 8Photo 9Photo 10Photo 11Photo 12
Drawing marked up Coming soonThe revised sheet, with the change traced on it.
Draft variation letter Coming soonDrafted from the pack, for your team to edit and send.

One real change, anonymised: posts paraphrased; dates and counts as posted.

  • The instruction, as it was given

    Who asked, when and in which group, in their own words, logged the day it's posted.

  • Checked against your scope

    The BOQ had vinyl flooring on the first floor and the drawings SPC, with no floor-tile quantity, so the switch to tiles is a potential variation.

  • Work done and photos, in date order

    113 boxes delivered on 5 Nov and laid by 10 Nov: 9 site updates and 12 photos, numbered as they were posted, from both groups.

  • Your team prices and raises it

    Quantities and rates are left for your team; Velora doesn't price or send anything. Drawing mark-up and a draft variation letter are coming soon.

See it on your own project.​

Talk to us about your next fit-out and we'll set up a pilot against its live WhatsApp groups and your BOQ.

We start with a three-month pilot, working closely with your team. On your live sites, at a heavily discounted pilot rate and with no long-term commitment.

  • Onboarded with your team
  • Tuned to how your teams work
  • Refined on your feedback

What we'd need to start a pilot.

  1. A spare WhatsApp number

    Linked to Velora and added to your groups as one more member. No personal chats are connected.

  2. Your site and client groups

    The groups where progress, changes, hold-ups and deliveries are posted today, including the one your client is in.

  3. Your scope

    The BOQ or work order annexure, and the store's floors. Loaded once.

A sample chat export lets us test on your own messages before going live.

Frequently asked questions

Common questions from fit-out project heads and billing engineers.

Yes. Work done is matched to your BOQ lines by floor, with the photos behind each, so the proof for a running bill or a milestone is in one place. Billing directly by stage or milestone is something the team is still working on. Velora tracks quantities; your team sets the rates and finalises the bill.

Yes. Velora joins your client group and your internal groups as one more member, through a spare number you link, and reads what's posted. Each change the client's design team asks for is logged with who asked and when.

No. Velora checks each instruction against your scope and packages the proof. Your team adds quantities and rates, and decides what goes to the client. The variation pack is in early access: in the pilot, our team prepares it with yours. Drawing mark-up and a draft variation letter are coming soon.

Use case: variation claims →

Yes. Daily and weekly progress reports with photos, and manpower reports from the headcounts site posts, come from the site record. The weekly one is a draft for your team to review before it goes out.

Velora reads text, voice notes and photos in the languages your teams use, including photos of challans, and keeps each original message with the record it created. Reading videos is something the team is still working on.

We run a discounted pilot for the first three months on one project: the full product, with no long-term commitment.