Stop piecing each variation together from the groups. Every change your client instructs, backed with its records.

48 hoursTo state the time and cost of a change under one fit-out's work order, or it's deemed accepted.

Variations under JCT and compensation events under NEC4 are instructed in the site groups and on site walks, and reported in passing. Velora logs each instruction with who gave it, when, where and the photos, so the quotation isn't built from scroll-back.

Every instruction on record from the first post. Each change your client or its Project Manager instructs, logged with who instructed it, the date, the place and the photos. Later posts about the same change join the same entry.
Checked against your scope and contract. Work with no BoQ item lands in your pack as potential extra work, with its photos. Where your contract is uploaded, each new change is checked against it.
Packaged for your team to notify. In early access: the instruction, the scope check, the work done and the photos in date order, for your QS to add quantities and rates. In the pilot, our team prepares it with you.

No new app for site teams.

The change was instructed in the group. The records are pieced together by hand.​

A variation or compensation event is assessed on the instruction, the work done and the records behind it.

Claim

Seven possible scope changes in five weeks.

  1. Client instruction
  2. Work done
  3. Proof (breaks here today)
  4. Raised for approval

The work order gives you 48 hours to state the time and cost of a change, or it's deemed accepted. The proof for one flooring change sat across two WhatsApp groups, email and two drawing revisions.

Claim

Extra work done on a verbal instruction.

  1. Client instruction
  2. Work done
  3. Proof (breaks here today)
  4. Raised for approval

Under NEC4 cl. 13.1, instructions count only in a form that can be read, copied and recorded. Photos in a WhatsApp group aren't an instruction.

Claim

A drain extended here, a kerb changed there.

  1. Client instruction (breaks here today)
  2. Work done
  3. Proof
  4. Raised for approval

Each change is too small to write up on the day it's instructed. By the time the valuation is due, the instruction, the dates and the photos are weeks back.

Claim

Instructed in one month. Built in the next.

  1. Client instruction
  2. Work done (breaks here today)
  3. Proof
  4. Raised for approval

The instruction is posted in the client's group; the work starts weeks later, reported in the site group. Tying the two together, with the photos in date order, is done by hand.

The change was real and the work was done. The time goes into piecing the records back together, change by change.

From an instruction in the group to a pack your team can notify.​

Your site teams keep posting the way they do today. Nobody has to fill in a change register.

  1. Read

    Every instruction, as it's posted

    Changes your client or its Project Manager instructs, in the client group, the site groups or reported from a site walk: picked out of text, voice notes and photos, in any language.

  2. File

    Logged as a scope change

    Each logged with who instructed it, the date, the place and the photos. When site posts about the same change again, the post and its photos join the same entry.

  3. Check

    Against your scope and contract

    Work done with no BoQ item lands in your pack as potential extra work, with its photos. Where your contract is uploaded, each new scope change is checked against it, read as written: NEC4, JCT or your own amended form.

  4. FlagEarly access

    One proof pack, to get it agreed

    The variation pack: the instruction in the words it was given, the scope check, the work done by date and location, and the photos numbered in date order. Your QS adds quantities and rates, and your team notifies it to get it agreed.

Each scope change ends in one proof pack your team uses to get it agreed with the client. Capturing the changes is live today, as part of the site record. The pack is early access: in the pilot, our team prepares it with you. Drawing mark-up and a draft variation letter are coming soon.

One change, packaged for your team to price.​

The drain extended on the PM's verbal instruction, as a variation pack. In early access, our team prepares it with yours from the site record.

Variation report · VR-01Drain extended 40 m
Early access
1Summary
Instruction
“Drain extended 40 m on the PM's verbal instruction”
Instructed by
The PM's verbal instruction, as reported on site · 14 Oct · Package 2 · Section 2
Scope
No BoQ item covers the extension
Work done
40 m · Ch 45+200 – 45+240 LHS
Evidence
3 site updates · 6 photos
2Work record
DateSite team’s wordsPhotos
14 OctDrain extended 40 m on the PM's verbal instruction1–2
3–4
5–6
3Quantity and value For your team
ItemQtyRateAmount
Drain extended 40 m, Ch 45+200 – 45+240 LHSFrom site updates: 40 m
4Photographs, in date order
Photo 1Photo 2Photo 3Photo 4Photo 5Photo 6
Drawing marked up Coming soonThe affected sheet, with the change traced on it.
Draft variation letter Coming soonDrafted from the pack, for your team to edit and send.
  • The instruction, as it was given

    Who asked, when and in which group, in their own words, logged the day it's posted.

  • Checked against your scope

    No BoQ item covers the extension, so the 40 m is a potential variation or compensation event.

  • Work done and photos, in date order

    Each update with its chainage and date, and the site photos numbered as they were posted.

  • Your team prices and notifies it

    Quantities and rates are left for your QS; Velora doesn't price or send anything to your client.

Back every change with its records.​

Talk to us about one live project and we'll set up a pilot against its WhatsApp groups and your scope.

We start with a three-month pilot, working closely with your team. On your live sites, at a heavily discounted pilot rate and with no long-term commitment.

  • Onboarded with your team
  • Tuned to how your teams work
  • Refined on your feedback

Frequently asked questions

Common questions from commercial managers, QSs and project directors.

Yes. Velora logs each instruction posted in your groups as a scope change, with who gave it and when, whatever the form. Where your contract is uploaded, each new change is checked against its clauses as written, amendments included. Your team decides whether it's a Variation, a compensation event or neither, and notifies it.

The instruction as it was given (who, when, in their words); the check against your scope (no BoQ item, or past its quantity); the work done, dated and by location; and the site photos, numbered in date order. The quantities and rates are left for your team to add. A marked-up drawing and a draft variation letter are coming soon.

No. Velora flags a potential variation or compensation event and packages what backs it. Your team marks it, adds the quantities and rates, and raises it with your client. Velora never prices a change and never sends anything to your client.

For each scope change, Velora pulls the proof together into one pack, so your team can get it agreed with the client. Picking the changes out of your WhatsApp groups, with who instructed them and their photos, is live today and, where your contract is uploaded, each new one is checked against it. Work with no BoQ item is kept in the pack as potential extra work. The pack is early access: in the pilot, our team prepares it with you. A marked-up drawing and a draft variation letter are coming soon.

Yes. Velora joins your client group and your internal groups as one more member, through a spare number you link, and reads what's posted. Each change your client instructs is logged with who asked and when, and later posts about it in either group join the same entry.

Yes. A pack covers the work from the instruction to the day it is prepared, whatever the month, and a later pack adds to the same variation rather than starting a new one.

We run a discounted pilot for the first three months on one project: the full product, with no long-term commitment.