Stop chasing what each possession got done. Value every metre. Put every lost possession on record.

Earthworks, structures, track and OLE run at different worksites at once, on Network Rail CP7 renewals and enhancements or new-line civils such as HS2, much of it inside possessions and isolations, each team posting in its own group, so the month's quantities wait on reports pieced together at month-end. Velora reads every group and files each update by location and line. No new app for site teams.

ValueEvery possession's work ready for the valuation. Earthworks, sub-ballast, track and OLE structures totalled per item, with the location, line, dates and photos behind each one.
ClaimContract triggers caught the same day. A possession cancelled at short notice, another contractor in the worksite, a revised design that adds work: each matched to the clause it may trigger while there's time to notify it.
PayEvery posted load and litre on record. Sub-ballast, fill and concrete by supplier, client-supplied rail, sleepers and ballast recorded as free-issue, and diesel tracked by machine and vehicle.
Section 3 · Formation & Track
MML2 112m – 128m · Liam, Velora +9
Liam
Sub-ballast done MML2 118m 20ch to 118m 50ch Up Fast, 650 m³
4 photos
4:20 PM
Section 3 · Possessions & Structures
Ahmed, Velora +5
Ahmed
Tonight's possession at MML2 121m cancelled at short notice, bridge deck lift held, gang and crane standing
2 photos
2:10 PM
Stores · Compounds
Dave, Velora +3
Dave
Sub-ballast received at the 116m compound, 6 lorries, 172 t, Ridgeway Quarries
Weighbridge tickets
5:25 PM
+5 More Groups
Velora
This month · Section 3Updated 5:26 PM
Sub-ballast · Up Fast2,000 m³
3 records this month, each with its location and photos
MML2 112m 40ch – 112m 64chSection 3 · Up Fast8 Oct680 m³
MML2 115m 05ch – 115m 29chSection 3 · Up Fast19 Oct670 m³
MML2 118m 20ch – 118m 50chSection 3 · Up FastToday650 m³
ValueReady for the valuation
Possession cancelled · MML2 121mLift held
Section 3 · cancelled at short notice, gang and crane standing, posted today
ClaimNotice deadline tracked
Sub-ballast · 116m compound172 t
Ridgeway Quarries · 6 loads · weighbridge tickets kept
PayIn the deliveries report by supplier
Section 3 · QC
QC Team, Velora +3
Inspection Record Pending
Sub-ballast MML2 118m 20ch – 118m 50ch Up Fast done today. Please share the inspection record for this stretch before the valuation date.
4:24 PM ✓✓
Helen · Project Director
Contract alert
Potential Compensation Event
Possession at MML2 121m cancelled at short notice, bridge deck lift held. If the cancellation is the client's, this may be a compensation event: notice period tracked from today. Log the gang and crane that stood by.
2:14 PM ✓✓
Sent on WhatsApp, the day it's detected

What slips at month-end

Work done in possessions. Valued weeks later.

A rail scheme runs earthworks, structures, track and OLE at once, much of it inside possessions and isolations, each team reporting in its own group. Quantities are agreed later, so small things slip: work done that never reached the valuation, cancelled possessions nobody put on record, loads nobody can trace.

Missed in the valuation

Bonds fitted in every possession. Some never reach the valuation.

"Rail bonds 18 no. fitted MML2 119m 05ch to 119m 08ch Up Fast": a few dozen bonds a shift, on both lines, one post among hundreds.

When the quantities are agreed, someone counts them back from scroll-back, and some are missed. The bonds are fitted; the valuation never saw them.

Possessions

Possession cancelled on the night. The time is never claimed.

The gang and the crane were in position; the possession was cancelled. Site posted it, then moved on to the next shift.

If the cancellation is the client's, notice has to go within the contract's window (eight weeks for a compensation event under NEC4), and weeks later nobody can list which possessions were lost.

Change

Bridge design revised. The extra work is valued at the old size.

The box for an underbridge was widened on a revised design, mid-construction. The site built it, and the post said so.

At the valuation the item goes in at the original size, and the extra concrete is never claimed.

Material cost

Sub-ballast tipped at three compounds. The quarry invoices for all of it.

Sub-ballast and fill arrive by the lorry from more than one quarry, by the tonne, each load with a ticket, tipped at compounds along the route. Rail, sleepers and track ballast come from the client.

At month-end, checking each quarry's invoice means finding tickets spread across groups and compounds.

None of it is a big miss. Across a whole scheme, it adds up.

What Velora picks up

What your site groups already carry, in railway terms.

Velora reads text, voice notes and photos in the groups your teams use today, and files each update by section, location and line.

  • Earthworks and drainage

    Formation, sub-ballast and drainage by location and line, with quantities and photos.

  • Structures

    Underbridges, culverts and platforms, stage by stage, counted when complete.

  • Track

    Track laid or renewed, ballast dropped and tamping, by location and line.

  • OLE

    Foundations, structures erected and wiring, by location.

  • Possessions

    Possessions and isolations given, cancelled, cut short or overrun, with the work each one held.

  • Deliveries

    Sub-ballast, fill and concrete by supplier, with tickets and delivery notes; client-supplied rail, sleepers and ballast recorded as free-issue.

  • Fuel

    Diesel issued to excavators, road-rail machines, rollers and road vehicles.

  • Instructions

    Site visits, instructions and revised designs from the client's team, logged with date and location.

Site teams change nothing. Velora joins each group as one more member.

What each team gets

Every team gets its part of the scheme.

Your QS gets the month's quantities in a report, contract triggers reach whoever you choose, project directors see every worksite today, and leadership sees every project. Nobody has to ask site for an update.

Billing Intelligence

This month's quantities, ready for the valuation.

Work done is matched to your BoQ or activity schedule and totalled for the month: cubic metres of earthworks and sub-ballast, track kilometres laid, OLE structures erected. Each total opens into the location, dates, photos and inspection records behind it, so your QS goes into the assessment with your own record. Missing documents are followed up on WhatsApp once you switch follow-ups on. Velora tracks quantities; your QS applies rates and finalises the application.

See Billing Intelligence
Contract IntelligenceEarly access

The contract triggers that are easy to miss.

Not just extensions of time and delay damages. A possession cancelled, an isolation cut short or another contractor in the worksite, but also design information that came late or a defect to correct: each is logged with its location and the date it was first posted, matched to the clause it may trigger, such as a compensation event under NEC4, and whoever you choose is alerted the same day, whether that's site, your commercial team or your contracts manager, then reminded before the notice period runs out. Your team decides what to notify.

See Contract Intelligence
Field Intelligence

Every worksite, every possession, without the calls.

Earthworks, structures, track and OLE by location and line, the possessions given and lost, deliveries by supplier and fuel by machine, from the groups your teams already post in. The daily and weekly reports are drafted from the same record, ready to review.

See Field Intelligence
Portfolio Intelligence

Every project in one view.

For the managing director or commercial director running several schemes: the blockers that have waited longest for a decision, by worksite, and, where Billing is on, which quantities are still waiting on proof.

See Portfolio Intelligence

Worked example

The month's work, ready for the valuation.

The client assesses the quantities. Velora gives your team its own record of every item, traced to the location and line, before that happens.

  • Totals per item

    Cubic metres of earthworks and sub-ballast, track kilometres and OLE structures erected, each matched to its item in the BoQ or activity schedule.

  • Ready for the assessment

    Every total lists its location, dates and photos, so the record is in hand when quantities are agreed.

  • Documents per line

    Inspection and test records, received or still missing, before the valuation date.

  • Changes kept on record

    Work added by a revised design or an instruction stays on record, so it can reach the valuation at the right size.

October · Section 3
Prepared from the site record
For your QS to review
Scope lineThis monthProofDocuments
Earthworks in formation18,400 m³22 stretches · photosDocuments: All in
Sub-ballast, Up Fast2,000 m³3 stretches · 18 photosDocuments: Inspection record missing
MML2 112m 40ch – 112m 64ch680 m³8 Oct
MML2 115m 05ch – 115m 29ch670 m³19 Oct
MML2 118m 20ch – 118m 50ch650 m³31 Oct
OLE structures erected64 no.64 locations · photosDocuments: All in
Track laying3.2 kmUp Fast · 112m – 114mDocuments: All in
Underbridge MML2 120m 40ch, box widenedRevised designClient's instruction · photosDocuments: Potential change
Velora tracks quantities. Your QS applies rates and finalises the application.

Illustrative figures

Getting started

What we'd need to start a pilot.

A pilot runs on one project and its live site groups. Your site teams don't change how they post.

  1. A spare WhatsApp number

    Linked to Velora and added to your site groups as one more member. No personal chats are connected.

  2. Your site groups

    The worksite, possessions, structures, stores and plant groups where updates are posted today.

  3. Your scope

    The BoQ or activity schedule, and the scheme's ELRs and mileages or chainage limits, and lines. Loaded once.

A sample chat export lets us test on your own messages before going live.

See it on your own project.

Talk to us about your scheme and we'll set up a pilot against its live WhatsApp groups and your BoQ or activity schedule.

Frequently Asked Questions

Common questions from rail project directors and QSs.

No. Velora keeps your own record of work done, by location, line and date, with photos and documents, so your team can check it against what the client assesses and raise anything missing.

On a target contract you're paid Defined Cost, so Velora's quantities are your progress record against the activity schedule and target, and your compensation event record, not the payment itself.

From the location in the post as your teams write it: the ELR, mileage and line, like "MML2 118m 20ch to 118m 50ch, Up Fast", or metric chainage on new lines such as HS2, matched to the stretches set up for the scheme. A quantity stated in the post is used as posted. A post that can't be placed is kept for your team to place, not guessed.

Yes. Velora reads text, voice notes and photos in the languages your teams use, including photos of delivery notes, possession plans and inspection records, and keeps each original message with the record it created.

Every possession posted as given, cancelled, cut short or overrun is logged with its date, location and the work it held, so the record is ready when a delay is argued. Velora flags the ones that may trigger a clause in your contract; your team decides what to notify. Contract Intelligence is in early access.

No. Those are the clauses every team watches. Velora also checks routine updates against the rest of your contract: a delay by another contractor or by the client, late design information, a defect to correct, each matched to the clause it may trigger, such as a compensation event under NEC4, with the deadline and the record behind it. Whoever you choose, whether site, your commercial team or your contracts manager, is alerted the same day. Velora doesn't send notices. Contract Intelligence is in early access.

Yes. On tram and light rail work, track slab, OLE, stops and utility diversions are captured by location the same way, and matched to your BoQ or activity schedule.

Yes. On road, water and overhead line works, progress posted by chainage or tower is totalled per scope item, with the photos and documents behind each total.

Road construction →

We run a discounted pilot for the first three months on one project: the full product, with no long-term commitment.