Stop writing up the site diary from calls every evening. Your records and reports, drafted from what site already posts.

Progress, labour, plant, deliveries and blockers are posted in your site groups all day. Velora records them through the day, keeps every entry dated and timed with the message it came from, and drafts the daily, weekly and monthly reports from that record, sent on a schedule to whoever needs them. No new app and no new format for site teams.

A dated record, every evening. Work done by location with its quantities against scope, and labour by subcontractor, each entry kept with the message and photo it came from.
Weekly and monthly from the same record. Progress against scope, a written weekly report, deliveries by supplier and consumption, without rebuilding anything.
Sent on a schedule. Each report on its own day and time, on WhatsApp or email, to the project manager, head office or the client.
Package 2 · Site Updates
Highway Package 2 · Dan, Velora +8
Dan
Ch 112+340 LHS patch done, L 2.4 W 1.5. Ch 114+050 RHS L 3 W 1.8
4 photos
4:52 PM
Package 2 · Labour
Imran, Velora +5
Imran
Labour today: Northgate Civils 18, Apex Labour 21, direct 7
1 photo
5:30 PM
Store · Receipts
Marek, Velora +3
Marek
Emulsion received, 2 t, Northfield Bitumen
Invoice photo
5:52 PM
+4 More Groups
Velora
Today · Highway Package 2Updated 6:40 PM
Pothole and patch repair62.4 m²
17 patches today, each with its chainage, size and photo
Ch 108+920 LHS6.0 × 2.0 m11:05 AM12.00 m²
Ch 112+340 LHS2.4 × 1.5 m4:52 PM3.60 m²
Ch 114+050 RHS3.0 × 1.8 m4:52 PM5.40 m²
ValueIn today's Progress vs Scope
Labour46
Northgate Civils 18 · Apex Labour 21 · direct 7
PayIn the Daily Manpower Report
Bitumen emulsion2.0 t
Northfield Bitumen · invoice photo kept
PayIn the deliveries report
Tom · Project Manager
Daily reports
Daily Progress vs Scope
Hi Tom, here's the Daily Progress vs Scope for Oct 24, 2026 — everything recorded up to the end of Sat, Oct 24.
Highway Package 2 Progress vs Scope (Oct 24, 2026).xlsx
7:00 PM ✓✓
Sarah · Head Office
Daily reports
Daily Manpower Report
Hi Sarah, here's the Daily Manpower Report for Oct 24, 2026 — everything recorded up to the end of Sat, Oct 24.
Highway Package 2 Manpower Report (Oct 24, 2026).xlsx
7:00 PM ✓✓
Sent on WhatsApp or email, every evening

Where the evening goes

Everything in the diary was already posted. Someone types it up again.

The site diary is written up every evening, and the weekly and monthly reports are rebuilt from it. Nearly all of it was already posted in the groups, and gets typed up again from memory and calls. On NEC and JCT jobs, that record is also the evidence when a delay or a change is assessed.

Compiled from calls

The diary is written at 7 pm, from memory.

The site manager rings each foreman and writes up what they remember, after a full day on site.

What was posted in the groups at 11 am, with photos, often isn't what reaches the diary.

Two versions of the day

The group says one thing. The diary says another.

A patch size in a caption, a labour count in another group, a delivery in a third.

When the diary is retyped, numbers drift, and nobody can say which version the valuation or the client should trust.

Rebuilt every week

The weekly report, rebuilt from seven diaries.

The weekly and monthly reports are rebuilt from the dailies and a scroll-back, in another format for the client.

The same work is typed three times, and the monthly report is late.

Labour on paper

Headcounts by subcontractor, added up by hand.

Each subcontractor's count is posted in a different message, some as a photo of the sign-in sheet.

The daily labour return is totalled by hand, and the month's total by subcontractor is never quite right.

The information is all there. Retyping is what eats the evening, and what thins the record a delay is later assessed on.

How Velora does it

One record, every report.

Your site teams keep posting the way they do today. The record and the reports come from what they post.

  1. Read

    Every update, as it arrives

    Progress, labour counts, plant, deliveries, fuel, blockers and photos, from text, voice notes and photos of sign-in sheets, in any language.

  2. File

    By location and scope

    Each update filed by work area and location, matched to its BoQ line, with quantities worked out from captions and marked as calculated, stated or counted.

  3. Check

    Drafted for review

    Each report is drafted in its format from the record. Have it sent on schedule, or generated in the app for the site manager to check first.

  4. Flag

    Sent on schedule

    Each report goes out on its own day and time, on WhatsApp or email, to the people set up for it.

Every entry in the record keeps the message and photo it came from, with its date and time.

Worked example

Every report on its own schedule.

The reports one project sends, each set up once with its recipients. All of them are drafted from the same site record.

  • Daily, to the project manager

    Work done against scope and labour by subcontractor, every evening.

  • Weekly, to the client

    A written progress report, as a Word document.

  • Monthly, to the QS

    The month's quantities against scope, each with how it was measured.

  • To accounts and the plant manager

    Deliveries by supplier and fuel consumption by machine, on their own days.

Report schedule · Highway Package 2
Each set up once, with its recipients
Daily Progress vs Scope
Every day, 7:00 PM · Project manager, planning
WhatsApp
Daily Manpower Report
Every day, 7:00 PM · Project manager, head office
WhatsApp
Weekly Progress Report
Mondays, 9:00 AM · Client's project manager (Word)
Email
Monthly Progress vs Scope
1st of the month · QS
Email
Weekly Material Deliveries Report
Fridays, 6:00 PM · Accounts
WhatsApp
Monthly Material Consumption Report
1st of the month · Plant manager
WhatsApp

Illustrative schedule

Get tonight's daily reports without the typing.

Talk to us about one live project and we'll set up a pilot against its WhatsApp groups and your scope.

Frequently Asked Questions

Common questions from project managers, site managers and planners.

Work done by location with quantities, labour by trade or subcontractor, plant on site, materials received, blockers and delays, and photos. Velora drafts the work done against scope and labour by trade and subcontractor every day, with deliveries and consumption as their own reports; blockers and photos go in the weekly report. Plant in the reports is something the team is still working on, and so is a written daily site diary.

When a delay or a change is assessed, the record made at the time is the evidence: who and what was on site, what was done where, and what held the work up. A diary written up from memory at 7 pm is thinner than what site posted during the day. Velora keeps each entry with the message and photo it came from, dated and timed.

Progress against scope daily, weekly and monthly; labour reports daily, weekly and monthly; a written weekly progress report as a Word document; and material deliveries and consumption reports. Each goes on its own schedule, on WhatsApp or email.

Reports come in Velora's formats, as Excel or Word files. Filling a client's own template is something the team is still working on.

Yes. Velora reads text, voice notes and photos in the languages your teams use, including English, Polish, Romanian and more, and photos of sign-in sheets and plant logs, and keeps each original message with the record it created.

We run a discounted pilot for the first three months on one project: the full product, with no long-term commitment.