Skip to main content

Stop chasing every block for what got done. Value what's built. Put every hold-up on record.

A residential scheme runs structure on one block, finishes on another and M&E across all of them, each trade posting in its own group, so the month's quantities and checklists wait on reports pieced together at month-end. Velora reads every group and files each update by block, floor and flat. No new app for site teams.

ValueEvery pour and finish in this month's valuation. Each total, per BoQ item or activity schedule line, carries the blocks, floors and flats behind it, with photos and the pre-pour checklist for every slab and column.
ClaimContract triggers caught the same day. An area not given, late information, an instruction on site: each matched to the clause it may trigger while there's time to notify it.
PayEvery delivery accounted for. Materials you buy direct or free-issue to labour-only gangs, such as blocks, plasterboard and fittings, by supplier with delivery notes.
Block B · Structure
Meridian Quarter · Greg, Velora +7
Greg
Block B level 7 slab poured, 46 m³
4 photos
5:42 PM
Block A · Finishing
Priya, Velora +9
Priya
Podium joint near lift lobby leaking again, resealed today
3 photos
6:05 PM
Site · Stores
Marek, Velora +3
Marek
Blocks received, 20 pallets, Pennine Builders Merchants, delivery note attached
Delivery note
6:20 PM
+9 More Groups
Velora
October · Meridian QuarterUpdated 6:21 PM
RC slab, C32/40 · Block B184 m³
4 slabs this month, each with its pre-pour checklist and photos
Block B · Level 5 slabChecklist signed14 Oct46 m³
Block B · Level 6 slabChecklist signed22 Oct46 m³
Block B · Level 7 slabChecklist pendingToday46 m³
ValueIn this month's valuation
Podium joint · Block A3rd repair
Resealed today, after 14 Jul and 2 Sep · photos kept
ClaimRepeat repair flagged
Blocks, 140 mm20 pallets
Pennine Builders Merchants · delivery note kept
PayIn the deliveries report by supplier
Block B · QC
QC Team, Velora +4
Checklist Pending
Block B level 7 slab poured today, 46 m³. Please share the signed pre-pour checklist so it's filed with the slab.
6:24 PM ✓✓
James · Project Director
Contract alert
Repeat Repair
Block A podium joint resealed today, its 3rd repair since 14 Jul. A repair that keeps failing points to a cause someone has to own, the waterproofing subcontractor or the design. The dates and photos of all three repairs are kept.
6:30 PM ✓✓
Sent on WhatsApp, the day it's detected

What slips at month-end

Many blocks, many trades. Each with its own proof.

A residential scheme runs structure, finishes and M&E at once, across blocks and phases, each trade reporting in its own group. Nothing is totalled until month-end, so small things slip: finishes that missed the valuation, checklists nobody collected, repairs nobody connected, loads nobody can trace.

Missed in the valuation

Tiling finished in 37 flats. 34 reached the valuation.

"Flats 1204 and 1205 bathroom tiling done": a flat or two a day, across blocks, one post among hundreds from the finishing subcontractors.

At month-end someone counts flats back from scroll-back, and a few are missed. The flats are tiled; the valuation never saw them, so they wait for next month.

Checklists

Slab poured on time. The pre-pour checklist is in someone's camera roll.

A pre-pour checklist is signed off by your engineer, sometimes witnessed by the clerk of works, before every slab, column and pile cap is poured, and photographed into whichever group is nearest.

When it's needed, to release the frame subcontractor's payment, for the warranty inspector or the handover file, it's hunted across groups.

Repeat repairs

The same joint resealed a third time. Nobody connected the repairs.

The podium joint leaked again and the site resealed it, as it had twice before. Each repair was posted; nobody connected them.

A repair that keeps failing points to a cause someone has to own, the waterproofing subcontractor or the design, and if it isn't fixed at source it carries into the rectification period and holds the second half of retention. By the time anyone pulls the three repairs together, the argument has started without the record.

Material cost

Blocks arrive by the lorry load. Delivery notes are scattered.

Blocks, plasterboard, tiles and fittings you buy direct arrive from several suppliers all month, each load with a delivery note photographed into a stores group.

At month-end each supplier invoice is checked against delivery notes nobody can find, so it gets paid as invoiced.

None of it is a big miss. Across blocks and trades, it adds up.

What Velora picks up

What your site groups already carry, in building terms.

Velora reads text, voice notes and photos in the groups your teams and subcontractors use today, and files each update by block, floor and flat.

  • Progress by location

    Pours, blockwork, drylining, tiling and M&E by block, floor and flat, with photos.

  • Checklists and tests

    Pre-pour checklists, inspection records and cube tests, filed against the work they prove.

  • Deliveries

    Blocks, plasterboard, tiles and fittings by supplier, with their delivery notes, including materials free-issued to labour-only gangs.

  • Delays

    Areas not given, information awaited, work stopped, with the block or floor each one holds.

  • Instructions

    Site visits and instructions from the Contract Administrator, Employer's Agent or architect, logged with date and location.

  • Repairs

    Leaks, cracks and rework reported on site, with photos, so a repeat repair on the same element shows up.

  • Labour

    Gangs and subcontractor labour on site, by block and trade.

  • Commitments

    Who promised what, by when: a slab cycle, a delivery, a flat handover.

Site teams change nothing. Velora joins each group as one more member.

What each team gets

Every team gets its part of the project.

Your QS gets the month's quantities in a report, contract triggers reach whoever you choose, project directors see every block today, and leadership sees every project. Nobody has to ask site for an update.

Billing Intelligence

This month's quantities, ready for the valuation.

Work done is matched to your BoQ or activity schedule and totalled for the month. Each total opens into the blocks, floors, flats, dates and photos behind it, with the pre-pour checklist for every slab and column for the handover file and subcontractor payments, and missing ones are followed up on WhatsApp once you switch follow-ups on. Velora tracks quantities; your QS applies rates and finalises the application.

See Billing Intelligence
Contract IntelligenceEarly access

The contract triggers that are easy to miss.

Not just extensions of time and LADs. An area not given or late information, but also work held by another package or a defect to correct: each is logged with its location and the date it was first posted, matched to the clause it may trigger, such as a Relevant Event under JCT or a compensation event under NEC4, and whoever you choose is alerted the same day, whether that's site, your commercial team or your contracts manager, then reminded until it's dealt with. Your team decides what goes to the client.

See Contract Intelligence
Field Intelligence

Every block, every day, without the calls.

Progress by block, floor and flat, the delays holding each block, deliveries by supplier and commitments followed up, from the groups your teams and subcontractors already post in. Daily, weekly or monthly reports are drafted from the same record, ready to review and send to your client.

See Field Intelligence
Portfolio Intelligence

Every project in one view.

For the managing director or commercial director running several projects: the blockers that have waited longest for a decision, by block, and, where Billing is on, which quantities are still waiting on proof.

See Portfolio Intelligence

Worked example

The month's valuation, built from the site record.

Building work is valued per BoQ item or activity schedule line, floor by floor. Velora keeps each total and its proof together.

  • Totals per scope line

    Cubic metres of concrete, square metres of blockwork, drylining and tiling, and counts of doors and fittings, for each BoQ item or activity schedule line.

  • By block, floor and flat

    Every total lists where the work was done, with dates and photos, so your QS can check it before it goes to the client.

  • Checklists per pour

    The pre-pour checklist for every slab, column and pile cap, received or still missing, for the handover file and before subcontractor payments.

  • Gaps before the valuation

    Work done that matches no BoQ item, and items posted without a measurement, flagged to your QS before the application goes in.

October valuation · Meridian Quarter
Prepared from the site record
For your QS to review
Scope lineOctoberWhere and whatDocuments
RC slab, C32/40 · Block B184 m³4 slabs · 22 photosDocuments: Checklist missing
Block B · Level 4 slab46 m³6 Oct
Block B · Level 5 slab46 m³14 Oct
Block B · Level 6 slab46 m³22 Oct
+1 more · Level 7 slab, checklist pending
Blockwork, 140 mm · Blocks C–D1,240 m²16 floors · 38 photosDocuments: All in
Drylining · Block A4,860 m²58 flats · 74 photosDocuments: All in
Bathroom tiling · Block A1,520 m²37 flats · 52 photosDocuments: Checklist missing
Velora tracks quantities. Your QS applies rates and finalises the application.

Illustrative figures

Getting started

What we'd need to start a pilot.

A pilot runs on one project and its live site groups. Your site teams don't change how they post.

  1. A spare WhatsApp number

    Linked to Velora and added to your site groups as one more member. No personal chats are connected.

  2. Your site groups

    The groups where progress, checklists, deliveries and delays are posted today, including your subcontractors' groups.

  3. Your scope

    The bill of quantities or activity schedule, and the project's blocks and floors. Loaded once.

A sample chat export lets us test on your own messages before going live.

See it on your own project.

Talk to us about your project and we'll set up a pilot against its live WhatsApp groups and your bill of quantities or activity schedule.

Frequently Asked Questions

Common questions from residential project directors and QSs.

Contractors building flats and housing for housing associations, build-to-rent and student accommodation operators and private developers, where the work is valued monthly and site teams report on WhatsApp.

Yes. Scope is loaded from the document that holds it, a bill of quantities, a contract sum analysis or an activity schedule, and work done is matched to its lines and totalled for the month, with the blocks, floors and flats behind each total. Valuing by stage or milestone is something the team is still working on. Velora tracks quantities; your QS applies rates and finalises the application.

Each slab, column or pile cap that needs a checklist is listed for the project. When a signed checklist is posted in a site group, it is filed against that element; the ones still missing go out in a daily digest to the people who owe them, once you switch follow-ups on. Every line shows which checklists are in, for the handover file and before the frame subcontractor is paid.

Yes. Velora reads text, voice notes and photos in English, Polish, Romanian and the other languages your teams and subcontractors use, including photos of checklists and delivery notes, and keeps each original message with the record it created.

Yes. Daily, weekly or monthly reports are drafted from the site record, by block and floor with photos, for your team to review before they go out.

No. Extensions of time and LADs are the clauses every team watches. Velora also checks routine updates against the rest of your contract: late information reported by site, work held by another package or a defect to correct, each matched to the clause it may trigger, with the notice it calls for and the record behind it. A repair that keeps failing is kept on record, to recover from the trade that owns it. Whoever you choose is alerted the same day. Velora doesn't send notices; your team decides what to send. Contract Intelligence is in early access.

We run a discounted pilot for the first three months on one project: the full product, with no long-term commitment.