Stop chasing steel and pipework quantities at valuation time. Value what's built. Put every hold-up on record.

A warehouse, factory, data centre or process plant runs groundworks, steel frame, cladding, pipework and equipment at once, area by area, each subcontractor posting in its own group, so the month's quantities and test records wait on reports pieced together for the valuation. Velora reads every group and files each update by area and grid. No new app for site teams.

ValueEvery tonne and metre in this month's valuation. Each total, per BoQ item or activity schedule line, carries the areas behind it, with photos, NDT reports, test packs and inspection records.
ClaimContract triggers caught the same day. Access to an area not given, client-supplied equipment arriving late, an instruction that changes the work: each matched to the clause it may trigger while there's time to notify it.
PayEvery load accounted for. Free-issue pipe and fittings from the client's store, and the materials you buy direct, with delivery and issue notes, and what was used against what arrived.
Structures · Erection
Plant expansion · Gareth, Velora +7
Gareth
Pipe rack PR-2 erection done, grid 4 to 9, 18.4 t
4 photos
5:35 PM
Pipework · Area 200
Lukasz, Velora +5
Lukasz
Free-issue pipe from the client still not received, pipework crew idle in Area 200
2 photos
6:00 PM
Site · Stores
Dave, Velora +3
Dave
Free-issue fittings drawn from the client's store for Area 100, 6 crates, issue note attached
Issue note
6:12 PM
+7 More Groups
Velora
October · Plant expansionUpdated 6:13 PM
Structural steel erection86.4 t
4 records this month, each with its area, grid and photos
Main building · grid A–DInspection record in8 Oct22.0 t
Compressor houseInspection record in24 Oct30.0 t
Pipe rack PR-2 · grid 4–9Inspection record pendingToday18.4 t
ValueIn this month's valuation
Free-issue pipe · Area 200Crew idle
Client-supplied materials not received · first posted today
ClaimDelay by the client flagged
Free-issue fittings · Area 1006 crates
Client's store · issue note kept
PayIn the free-issue record
Structures · QA
QA Team, Velora +4
Inspection Pending
Pipe rack PR-2 erection completed today, 18.4 t. Please share the erection inspection record before the steelwork subcontractor's payment.
6:15 PM ✓✓
Sarah · Project Director
Contract alert
Potential Entitlement
Free-issue pipe for Area 200 not received; pipework crew idle from today. May be a Relevant Event (JCT SBC 2016 cl. 2.29, an Employer default) or a compensation event (NEC4 cl. 60.1(3)). Notice forthwith under JCT, within eight weeks under NEC4. Keep the dated posts until the pipe arrives.
6:14 PM ✓✓
Sent on WhatsApp, the day it's detected

What slips at month-end

Groundworks, steel, pipework, equipment. All at once, area by area.

An industrial project runs every discipline at once, across areas and buildings, each subcontractor reporting in its own group. Nothing is totalled until the valuation, so small things slip: work done that missed the valuation, records nobody filed, client-side delays nobody put on record, free-issue nobody reconciled.

Missed in the valuation

1,180 pipe supports fixed this month. 1,120 reached the valuation.

"Area 200 supports fixed, 64 no.": a few dozen at a time, from the pipework crew, one post among hundreds.

At month-end someone counts them back by scrolling, and a few batches are missed. The supports are in; the valuation never saw them, so they wait for next month.

Test records

Line pressure-tested. The test pack never reached the valuation.

Each line is pressure-tested before insulation and its welds radiographed, and each test certificate is photographed into whichever group is nearest.

Where a line is valued only with its test pack, your QS looks for each one across groups at valuation time. Lines without one wait for next month.

Client-side delays

Client-supplied pipe arrived three weeks late. The record is a scroll.

The pipework crew posted it each day they waited for free-issue pipe. Nobody logged when it started or which area it held.

When time and cost are argued, the record is photos across groups, and the notice that was due forthwith under JCT, or within eight weeks under NEC4, went late.

Free-issue

Free-issue pipe and fittings from the client's store. Nobody knows what went where.

Pipe, fittings and valves are drawn from the client's store and issued to areas as the work needs them.

At the end the client asks for a free-issue reconciliation, and charges the shortfall nobody can explain.

None of it is a big miss. Across areas and disciplines, it adds up.

What Velora picks up

What your site groups already carry, in plant terms.

Velora reads text, voice notes and photos in the groups your teams and subcontractors use today, and files each update by area, building and grid.

  • Progress by area

    Groundworks, steel erection, cladding, pipework and equipment by area, building and grid, with photos.

  • Tests and records

    Pressure tests, NDT reports, inspection records and cube tests, filed against the work they prove.

  • Deliveries

    Pipe, fittings and consumables by supplier, with their delivery notes, including free-issue materials from the client's store.

  • Consumption

    Material issued and used, by area, set against what arrived.

  • Delays

    Areas not handed over, client-supplied materials late, work stopped, with the area each one holds.

  • Instructions

    Instructions from the client's engineer, project manager or Employer's Agent, logged with date and area.

  • Labour

    Operatives on site, by area and trade.

  • Commitments

    Who promised what, by when: an area, a test, a delivery.

Site teams change nothing. Velora joins each group as one more member.

What each team gets

Every team gets its part of the project.

Your QS gets the month's quantities in a report, contract triggers reach whoever you choose, project directors see every area today, and the board sees every project. Nobody has to ask site for an update.

Billing Intelligence

This month's quantities, ready for the valuation.

Work done is matched to your BoQ or activity schedule and totalled for the month. Each total opens into the areas, dates and photos behind it, with the NDT reports, test packs and inspection records it needs, and missing ones are followed up on WhatsApp once you switch follow-ups on. Velora tracks quantities; your QS applies rates and finalises the application.

See Billing Intelligence
Contract IntelligenceEarly access

The contract triggers that are easy to miss.

Not just extensions of time and LADs. An area not handed over or client-supplied materials arriving late, but also work held by another package or late design information reported by site: each is logged with its area and the date it was first posted, matched to the clause it may trigger, such as a Relevant Event under JCT or a compensation event under NEC4, and whoever you choose is alerted the same day, whether that's site, your commercial team or your contracts manager, then reminded until it's dealt with. Your team decides what goes to the client.

See Contract Intelligence
Field Intelligence

Every area, every day, without the calls.

Progress by area and trade, the delays holding each area, deliveries by supplier and materials used against what arrived, from the groups your teams and subcontractors already post in. Daily, weekly or monthly reports are drafted from the same record, ready to review.

See Field Intelligence
Portfolio Intelligence

Every project in one view.

For the managing director or operations director running several projects: the blockers that have waited longest for a decision, by area, and, where Billing is on, which quantities are still waiting on proof.

See Portfolio Intelligence

Worked example

The month's valuation, built from the site record.

Industrial work is valued per BoQ item or activity schedule line, area by area. Velora keeps each total and its proof together.

  • Totals per scope line

    Tonnes of steel erected, metres of pipework welded, numbers of supports and square metres of cladding, for each BoQ item or activity schedule line.

  • By area and grid

    Every total lists where the work was done, with dates and photos, so your QS can check it before it goes to the client.

  • Records per line

    NDT reports, test packs and inspection records, received or still missing, before the application goes in.

  • Gaps before the valuation

    Work done that matches no BoQ item, and BoQ items posted without a measurement, flagged to your QS before the application goes in.

October valuation · Plant expansion
Prepared from the site record
For your QS to review
Scope lineOctoberWhere and whatDocuments
Structural steel erection86.4 t4 areas · 34 photosDocuments: Inspection record missing
Main building · grid A–D22.0 t8 Oct
Pipe rack PR-116.0 t17 Oct
Compressor house30.0 t24 Oct
+1 more · PR-2, inspection record pending
Pipe supports · Areas 100–3001,180 no.6 areas · 48 photosDocuments: All in
Carbon steel pipework, 2–8 inch · Area 1001,860 m3 lines · 29 photosDocuments: Test pack missing
Roof cladding · Warehouse3,200 m²2 bays · 18 photosDocuments: All in
Velora tracks quantities. Your QS applies rates and finalises the application.

Illustrative figures

Getting started

What we'd need to start a pilot.

A pilot runs on one project and its live site groups. Your site teams don't change how they post.

  1. A spare WhatsApp number

    Linked to Velora and added to your site groups as one more member. No personal chats are connected.

  2. Your site groups

    The groups where progress, test records, deliveries and delays are posted today, including your subcontractors' groups.

  3. Your scope

    The BoQ or activity schedule, and the project's areas and buildings. Loaded once.

A sample chat export lets us test on your own messages before going live.

See it on your own project.

Talk to us about your project and we'll set up a pilot against its live WhatsApp groups and your BoQ or activity schedule.

Frequently Asked Questions

Common questions from industrial project directors and QSs.

Yes. Scope is loaded from the document that holds it, a bill of quantities, or the activity schedule or contract sum analysis on a design-and-build contract, and work done is matched to its lines and totalled for the month, with the areas behind each total. Valuing by stage or milestone is something the team is still working on. Velora tracks quantities; your QS applies rates and finalises the application.

Free-issue materials are recorded when they arrive and where they are used, like any other delivery. A wait for them is logged as a delay, with the area it holds and the date it was first posted, and checked against your contract for the clause it may trigger.

Yes. Quantities are read in the units your site posts and matched to the BoQ line they belong to. Where the unit or the line is unclear, the update is held for your QS to confirm, not guessed.

Yes. Deliveries are recorded by supplier with their delivery notes, and materials issued and used are recorded by area, so the two can be set side by side in daily, weekly or monthly reports. Velora doesn't match deliveries to purchase orders or invoices itself.

No. Extensions of time and LADs are the clauses every team watches. Velora also checks routine updates against the rest of your JCT, NEC, IChemE or amended contract: client-supplied materials arriving late, an area not handed over, work held by another package or late design information reported by site, each matched to the clause it may trigger, such as a Relevant Event or a compensation event, with the notice the contract requires and the record behind it. Whoever you choose is alerted the same day. Velora doesn't send notices; your team decides what to send. Contract Intelligence is in early access.

We run a discounted pilot for the first three months on one project: the full product, with no long-term commitment.