Skip to main content

Stop chasing updates. Stop drafting reports. Focus on running the site instead.

Velora Field Intelligence turns the WhatsApp messages, voice notes and photos your site teams already send into live progress, blockers, labour, delivery records and client-ready reports, so delays reach the people who can act the same day.

Decide faster. Progress, blockers, labour and deliveries (by supplier) tracked from site updates.
Stay aligned. Regular reports for clients and leadership, from the site record.
Site Team · Daily Updates
Ravi, John, Greg, Velora +5
John
Crane operator absent, pour on hold.
6:30 AM
Blocker
Tower B — Level 3 Slab pour on hold. Escalated to Site PM.
6:31 AM ✓✓
Site Team · Labour
Marek +2
Marek (Site)
Today: Bricklayer 6, Labourer 10, Electrician 3. Tom (Electrician) not reported.
7:45 AM
Attendance
19 present, logged. Tom (Electrician) absent — flagging no-show.
7:46 AM ✓✓
+6 More Packages
Velora
Progressvs scope
2 tracked · 1 short
Tower A – Level 12 Slab
Concrete · 118 / 120 m³ (−2)
HVAC – Level 2
Ducting · 410 / 450 m (−40)
Open Issuesaction needed
2 open · 1 resolved
DB panel shutdown not approved
Level 4 – Electrical · 5d
Crane operator absent
Tower B – Level 3 Slab · 2h
Action Itemstoday
2 open · 2 critical
Escalate shutdown approval
Site PM · Today
Arrange relief crane operator
Site PM · Today
Attendanceauto-compiled
19 present · 3 trades
Electrician
2 of 3 — Tom absent
Bricklayer · Labourer
6 · 10
Sarah · Project Manager
Daily Pulse
Focus today: — Crane operator absent, Tower B Level 3 pour on hold — 2h — Tom (Electrician) did not report, Level 4 — 1h Yesterday: — Rebar checklist submitted, Tower A Level 12 — Conduit laying complete, Level 2 east wing Want more detail on any of these, or should I send a reminder or check a due date with the team?
09:00 ✓✓
Delivered automatically, every morning

Why site control breaks down

Every one of these was reported. Every one still slipped.

Track the work, prove it happened, get the report out — three jobs, and the only thing holding them together is someone doing it by hand.

Tracking the work

One blocker. Three trades stall behind it.

A carpenter shortage holds up formwork on Level 3. Formwork slips, so the steel fixers wait behind it, so the pour crew — geared up and ready — has nothing to pour into.

Three days pass before anyone connects the dots. One blocker, mentioned once in one group, quietly stalled three trades behind it.

Proving it happened

Inspected and cleared. Try proving it happened.

QC clears the distribution board test on Level 4 — a photo and a thumbs-up reply from the site engineer. Work proceeds the same day, exactly as it should.

It's the only record — never filed to the site folder. The QS needs it for the valuation, and the project engineer goes hunting for it in chat.

Getting the report out

Due by 9am. Still collating messages by hand.

Wednesday's daily report and labour return are due to the PM's office by 9am. Thirty-odd messages sit across the two groups from overnight — photos, a voice note, headcounts in three formats — someone's typing it all up by hand.

It's ready at 9:40. The client's already called twice asking where it is.

You can keep that up on one site. Try it across five.

What we keep hearing

The more sites you run, the worse this gets.​

200 projects. Leadership flying blind.

We're running 200 projects. Leadership needs to see what's happening on the ground to make decisions — right now, that visibility just isn't there.
Contractor200+ Projects Portfolio

Promised in the meeting. Vanished after.

The firm's single biggest bottleneck is commitment disappearance — promises made but never tracked, verified, and closed.
Firm PrincipalArchitecture, Design & Construction

Across 19 groups. Problem noticed next day.

Someone flags a problem in one group. I'm across nineteen. Noticed next day. Only if I had all blockers across groups collated in one place.
Senior Project ManagerResidential & Commercial GC

In 20 site groups, still can’t hold subs to deadlines.

I'm on WhatsApp groups for all 20 sites. I still can't tell, who was behind on what this week. Unable to hold my subs to deadlines effectively.
Business OwnerConstruction & Warehousing

The Fix

Every update captured and structured, the ones that matter flagged, without anyone changing how they work.

Before
Ravi · Site Engineer
riser valve leaking, pump room flooding
6:42 PM ✓✓

One message. Twenty groups. Nobody connects it.

After
Blocker
Basement – Pump Room
Riser valve leak — pump room flooding, 2 days.
Escalated to Site PM · tracked to resolution

Flagged, owned and tracked, for your team to act on.

How it works

One WhatsApp QR Scan. Zero Change for Your Teams.

Add Velora to your existing WhatsApp groups. Your teams keep working exactly as they do — the same whether you connect one site or twenty.

01
Read

Captures every update your teams already send

Connect Velora to your existing WhatsApp groups. Messages, voice notes, photos — captured as they happen.

02
File

Every update read and filed, for your team to review

Progress, blockers, commitments, deliveries, material and fuel consumption, inspections, attendance — each read and filed by site and work area as updates arrive.

03
Check

Issues and blockers surfaced immediately

Updates from every group checked together. Issues and action items followed through to closure.

04
Flag

Flagged the moment it needs your attention

Blockers flagged for review. Know what arrived on site, by supplier, every day. Inspection records ready to find.

Data Sources

WhatsApp Messages
Voice Notes
Photos & Scans

Involved Parties

Main & EPCInfra & UtilitiesSpecialist TradesProject Managers
Velora

Velora AI

Read
File
Check
Flag

What You Get

Progress logged as work happens, every day
Blockers escalated before they compound
Inspections logged, NCs followed through
Commitments tracked to closure
Deliveries logged by supplier, every day

What Velora Delivers

Project intelligence — without changing how your teams work.

Site Visibility

Every work area — health, progress and blockers — on every site.

Each work area summarised with a health status, progress, blockers & commitments, structured from your group messages. Every site reports the same way, so you can scan across all of them instead of calling each PM — the same summary also lands as a daily pulse on WhatsApp, so you don’t even have to open the dashboard to get it.

Site View
Sunridge Phase II
At RiskLive
Work Front Health
6
1 at risk · 2 to watch · 3 on track
Status
Blockers
5
3 blocking · 2 hold points
Type
Overdue
6
4 issues · 2 actions
Breakdown
Work FrontIssuesBlockedUpdated
Tower B – Level 3 Slab
31Today
1 blocker1 hold point
Tower A – Level 4 Columns
21Today
1 RFI open2 issues open
Block B – Core & Stair
12Today
2 blockers1 NCR open
Level 2 – HVAC Ducting
——Today
On track
Podium – Level 2
——Today
On track
Basement – Pump Room
11Today
1 blocker
Pulse→ Sarah · Project Manager

Focus today: — Level 4 distribution board test checklist not received — 2h — Distribution board testing confirmation pending — 6h Yesterday: — Level 3 slab pour complete, photos logged — Conduit laying complete, Level 2 east wing Want more detail on any of these, or should I send a reminder or check a due date with the team?

09:00 ✓✓
What's blocking work
5 open · oldest first
Formwork not delivered — Tower B Level 3 work stopped
DelayTower B – Level 3 Slabneeded by 22 Jun
5d
open
M&E clearance blocked — 3 open RFIs unresolved
RFITower A – Level 4 Columns
4d
open
Riser valve leak — pump room flooding
DelayBasement – Pump Roomneeded by 23 Jun
2d
open
RC inspection hold point B5 — clearance pending
InspectionBlock B – Core & Stairneeded by 24 Jun
2d
open

Report Drafts

Progress and labour report drafts, ready to review.

Progress updates, photos, measurements, and headcounts pulled from your group messages into each report format. Review and confirm in under 5 minutes — not compile from scratch.

Daily Progress ReportDOCX
Report #042·Greenfield Heights·6 Apr 2026
Report highlights
🟢 Site health: On track⚠️ 2 critical · 3 medium👷 202 operatives (↑12 vs yesterday)📦 1 shortage · 🛠️ 1 downtimeInspection: T3 slab rebar sign-off pending

Executive summary: pours progressing; crane and conduit tracked under Issues with owners.

Progress by Work Area
Work AreaActivityStatus
T1 · L3–L5Plastering✅ Completed
T2 · L4Brickwork✅ Completed
T3Slab pour🔄 In progress
T2 · L8Formwork📅 Planned
Level 2Chilled water piping✅ Completed
Issues & blockers
IssueSev.OwnerStatus
Crane breakdown — T2🔴 Crit.PMOpen
Electrical conduit — material shortage🟡 Med.Site Eng.Open
Labour — 4 bricklayers short (T4 L3)🟡 Med.PMOpen
RFI: waterproofing spec🔵 LowQCPending
Prepared by · Reviewed by · Approver · Velora AI
Daily Labour ReportXLSX
202 operatives1,616 operative hours8h shift · 6 Apr 2026
LocationSubcontractorSupervisorTradeOpsHrs
T1 L4Northfield BuildersL. NovakLabourer45360
T1 L4Northfield BuildersR. DoyleCarpenter56448
T1 L3Northfield BuildersI. PopescuBricklayer38304
T2 L2Apex M&EA. KhanElectrician28224
PodiumSealCo—Fitter22176
GateSecureFenceP. WalshWelder13104
Total2021,616

Commitment Tracking

Issues, action items and daily update follow-ups and reminders — done automatically, fully in your control.

Velora messages the right person directly on WhatsApp — nudging for a daily report update at day's end, following up on issues that haven't moved, and checking in on action items before they're overdue. You decide what gets a follow-up — turn any of it off per site, per person, or altogether.

Site Team · Daily Updates
Ravi, John, Greg, Velora +5
Greg
Level 3 formwork struck, ready for pour tomorrow ✓
4:52 PM
Daily Report Reminder→ Ravi · Site Engineer
⏰ Your daily report update is due. Send today's progress. Any blockers?
5:00 PM ✓✓
Ravi
On it, sending now 👍
5:01 PM
John
Crane operator still not back, pour on hold since morning
5:02 PM
Issue Follow-Up→ Site PM
Issue still open 2 days — "Crane operator absent, pour on hold." Any update on resolution?
5:04 PM ✓✓
Site PM
Relief operator arranged, resuming tomorrow AM.
5:05 PM
Action Item Follow-Up→ M&E Engineer
Is this action item completed — "Push M&E engineer to close 3 open RFIs"? Due today.
5:08 PM ✓✓

The impact

The operational shifts that happen from week one.

No morning scroll. Blockers caught before they cost you. Reports that draft themselves. These are the shifts managers notice first.

What changes when nothing has to be reconstructed, chased, or rediscovered later.

No morning scroll

Start your day with signal, not scroll

Before your first call you're already spending 20 minutes scrolling back through groups to reconstruct what happened overnight. Velora surfaces what matters — progress flagged, issues open, action items outstanding — without the scroll.

Catch it before it slips

Blockers tracked to closure, not lost in the thread

A blocked work area starts as a single WhatsApp message. Flagged and tracked until it's resolved — not left buried in a thread nobody revisits.

Reports drafted for you

Progress and labour report drafts, daily, weekly or monthly

Velora drafts your progress and labour reports from the group messages — work area by work area, issue by issue. You review and confirm instead of compiling them by hand, and every day leaves a dated site record your commercial team can rely on when time or money is assessed.

Hold-points flagged early

Inspection gates caught as they happen — not at handoff

A hold point logged in the group — rebar ready, slab poured, a distribution board tested, pending sign-off — is flagged the moment it happens, not rediscovered when the next trade is blocked or at handover.

You can run two sites from the group chats. Not ten.

The work stays on WhatsApp. What doesn't scale is compiling the picture by hand — every site you add is another set of updates to chase and another report to write. Velora is the layer that keeps up. Request a pilot and we'll set it up on your live sites and existing groups, so you see it working on your own site data.

Frequently Asked Questions

Common questions from contractors who've seen site apps fail before.

No. Your site teams keep using WhatsApp & documents exactly as they do today. Velora reads what they already post across every group and document — no new apps, no forms, no training. It also works in the language your teams are most comfortable in: English, Polish, Romanian and more.

Velora reads whatever is in the groups from day one, however it's written.

As you see site records building from group messages, you'll naturally start directing site teams to share updates in the group rather than over calls or walk-ins.

Your site teams already prefer WhatsApp — and when sharing in the group saves them the effort of a separate call, they adopt without being asked.

When someone reports a blocker or commits to a date in a group, Velora logs it against the work area and the person responsible, and tracks it until it closes. Anything still open shows up in your PM's daily focus, so nothing depends on someone remembering to chase it. Velora doesn't message your groups by default. Follow-ups are off until you switch them on, and you choose where they go (every site, one site or one group) and what Velora asks about, such as missing details or due dates.

Yes. Velora drafts daily, weekly or monthly progress reports from the site record, for clients and leadership. Your PM reviews and confirms each one before it goes out.

Yes. Deliveries reported on site (delivery notes, weighbridge tickets and photos shared in WhatsApp) are logged by supplier and date, so you know what arrived on site, every day, and the supplier, source and delivery note behind each load are on record. It's a delivery record: it isn't matched to POs, invoices or payments.

Yes. Consumption reported in your groups (fuel loaded into each vehicle or generator, cement bags used, paint for road marking) is logged by date, material and the vehicle or place it went to, so your team can reconcile fuel and material costs, and exported to Excel daily, weekly or monthly. It's a record of what the site reports consuming: it isn't matched to stock systems, POs or invoices.

No — it takes the compilation off your hands. Your daily report format stays the same. Velora drafts it from the day's group messages. You review and confirm before it goes out. The process is the same; the compilation burden goes away.

Yes. On NEC and JCT jobs, time and money are assessed on contemporaneous records: who was on site, what was done and what held the work up. Velora keeps that record every day, dated, with the messages and photos behind each entry, for your team to use when it prepares a compensation event or extension of time submission.

Velora connects to as many groups as your site needs. All outputs are consolidated into one site view — without reading each group separately.

Site teams keep sharing updates exactly like they do today — no new step required. If they mention the work area in their message — 'House 12 plastering done' — Velora matches it against your site's work area structure and associates the update with it.

If a work area isn't mentioned, Velora still logs the update and tracks the location wherever it's referenced elsewhere in the conversation.

If a team keeps missing or misnaming work areas, one easy fix: Velora generates a QR code for each work area. Print it and stick it at the location — House 7, Block B Level 3, a client's plant room, whatever the work area is. Site teams scan the code, WhatsApp opens with the location pre-filled, they type their update and send. On a site with 50 houses, or a term contract covering 50 client sites, that's 50 QR codes placed once at setup — after that, every scan-and-send lands in exactly the right place.

We run a discounted pilot for the first three months — full product, no long-term commitment. See what it surfaces on your own sites before committing to a subscription.

Yes. Data is stored securely with role based access control, and privacy data is encrypted at rest using AES-256 standard.