Skip to main content

Stop matching supplier invoices to loads nobody recorded. Every delivery on record, by supplier.

Delivery notes and weighbridge tickets are posted in the stores and site groups as photos, or a load is only mentioned: "one tipper of 10 mm came". Velora reads each one, records the delivery by supplier, material and quantity with its papers, and builds the register your team checks supplier invoices and stock against.

Every load recorded, with its papers. Date, material, grade, quantity and vehicle, read from delivery notes, weighbridge tickets and invoices posted as photos.
Supplier and source kept apart. The supplier you pay and the quarry or plant named on the ticket are recorded as separate parties, as each paper prints them.
A deliveries report by supplier. Daily, weekly or monthly, filtered by supplier, source or material type, ready to check each supplier's invoice.
Stores · Deliveries
Highway Package 2 · Marek, Velora +3
Marek
20mm from Ridgeway Quarries, weighbridge ticket and delivery note attached
2 photos
11:20 AM
Plant · Site
Piotr, Velora +6
Piotr
one tipper of 10mm came
1 photo
12:05 PM
Accounts · Purchase
Sarah, Velora +2
Sarah
Emulsion invoice from Northfield Bitumen, 2 t, lorry reached site
Invoice photo
3:40 PM
+4 More Groups
Velora
Material Deliveries Report · Summary sheetExcel
20 mm aggregate · Ridgeway Quarries412.6 t
14 deliveries; on the Deliveries sheet, each with its ticket and delivery note numbers and net weight
Ticket 2163 · net 29.8 tDelivery note number listed too9 Oct29.8 t
Ticket 2187 · net 31.4 tDelivery note number listed too14 Oct31.4 t
Ticket 2251 · net 30.6 tDelivery note number listed too22 Oct30.6 t
PayIn the deliveries report by supplier
10 mm aggregateNot stated
"One tipper of 10 mm came" · no ticket, supplier not stated
PayListed as quantity not stated
Bond coat emulsion2.0 t
Northfield Bitumen · from the invoice photo
PayIn the deliveries report by supplier
Sarah · Commercial
Weekly report
Weekly Material Deliveries Report
Hi Sarah, here's the Weekly Material Deliveries Report for Oct 27 - Nov 2, 2026 — everything recorded up to the end of Mon, Nov 2.
Highway Package 2 Material Deliveries Report (Oct 27 - Nov 02, 2026).xlsx
9:00 AM ✓✓
Sent on WhatsApp or email, daily, weekly or monthly

Where material cost leaks

The loads arrive. The record of them often doesn't.

Checking a supplier's invoice or the stock means matching every load to its papers. On site, those papers are photos spread across groups, and some loads have no paper at all.

Tickets nobody kept

"One tipper of 10 mm came." The ticket stayed in the cab.

Posted with a photo and no ticket, between progress updates. On one road project we work with, most of a month's aggregate loads arrived this way.

At month-end, the supplier's invoice, in tonnes, is checked against loads with no ticket on record.

Papers in three groups

The ticket, the delivery note and the invoice, posted apart.

The weighbridge ticket goes in the stores group, the invoice in the accounts group, the delivery note wherever the driver handed it over.

Matching them to one load is done by hand, at month-end, from scroll-back.

Tickets lost

The ready-mix tickets were photographed. Never filed.

Each ready-mix ticket shows the volume, mix and batch time the supplier invoices against.

The tickets were photographed at the pump and posted. When the supplier's invoice comes in, nobody can find them.

Counted twice

One load in the register, the ticket and the evening report.

The stores register page, the weighbridge ticket and the evening report all record the same lorry.

Added up by hand, the supplier invoices it once and site counts it three times, so the shortfall hides.

None of it is a big miss. Across a month of loads, it adds up.

How Velora does it

One delivery per load, with its papers.

Your stores and site teams keep posting tickets and loads the way they do today.

  1. Read

    Every paper and every mention

    Delivery notes, weighbridge tickets and invoices posted as photos, and loads only mentioned in text or voice notes, in any language.

  2. File

    One delivery per load

    Papers for the same load are merged into one delivery: supplier, source, material, grade, quantity, vehicle and ticket numbers. A load posted with no quantity is kept as quantity not stated, not guessed.

  3. Check

    How each quantity was arrived at

    In the report, each delivery says how its quantity was set: weighed on the ticket, as written on a paper or in a message, or not stated. Loads still waiting for a tare weight stay out of the totals.

  4. Flag

    The register, on a schedule

    A deliveries report by supplier and material, daily, weekly or monthly, on WhatsApp or email, to whoever checks the supplier invoices.

Velora builds the delivery register, the goods received side. Matching it to purchase orders and supplier invoices (the three-way match) and to consumption stays with your team.

Worked example

The month's deliveries, by supplier.

The summary sheet of a monthly deliveries report: one line per supplier and material, with every delivery's paper numbers and weights on the next sheet.

  • By supplier and material

    The totals each supplier's invoice is checked against, in the unit each material is bought in.

  • What each total leaves out

    Loads awaiting a tare weight and loads with no quantity are counted in their own columns, never added into the total. The next sheet shows how each load's quantity was set.

  • Loads with no quantity, listed

    Kept as quantity not stated, with what site wrote ("one tipper came"), never guessed into a tonnage. The photos stay with each delivery in Velora.

  • Source kept with each load

    The quarry or plant named on each ticket, so you can show where a material came from when you are asked.

October · Material Deliveries Report
Highway Package 2 · Summary sheet, by supplier
1–31 Oct
Ridgeway Quarries · 20 mm aggregate
14 deliveries · 14 verified
412.6 tVerified
Ridgeway Quarries · Type 1 sub-base
7 deliveries · 1 awaiting tare, not in the total
171.2 tAwaiting tare
Northfield Bitumen · Bond coat emulsion
2 deliveries · 1 needs review
3.2 tNeeds review
Lineway Supplies · Thermoplastic road marking
1 delivery · not verified
4.5 tNot verified
Not stated · 10 mm aggregate
7 deliveries · posted as "one tipper came"
Quantity not stated
Excel: this summary, and every delivery with its ticket numbers and weights

Illustrative figures, in the format of one road project's October report

See every load on record, by supplier.

Talk to us about one live project and we'll set up a pilot against its store and site WhatsApp groups.

Frequently Asked Questions

Common questions from commercial teams, buyers and site managers.

It's checking the material received on site against what the suppliers invoiced, what was used in the work and what's left in stock, so shortfalls, excess wastage and wrong invoices are caught. Velora builds the goods received side of it: every delivery by supplier and material, with its papers.

No. Velora records each delivery with its supplier, quantity and papers, and the deliveries report lets your team check each supplier's invoice against it. The report does flag a delivery when its invoice bills more than 2% off the weighed quantity, or when a daily stores record's count of loads doesn't match the tickets posted. Comparing the material used with what was planned for the work is something the team is still working on.

The delivery is recorded with its date, material and photo, and its quantity is shown as not stated. It's never converted into tonnes or cubic metres on a guess.

The supplier you pay is recorded separately from the quarry or plant named as the source on the ticket, exactly as the paper prints it. The deliveries report can be filtered by either.

Yes. Photos and PDFs of delivery notes, tickets and invoices are read, up to 10 pages a PDF. A longer PDF is kept with its message.

Yes. Velora reads text, voice notes and photos of papers in the languages your teams use, and keeps each original message with its delivery.

We run a discounted pilot for the first three months on one project: the full product, with no long-term commitment.