Billing

Billing follows three steps: capture work done, match it to project scope, substantiate the bill. Work done on site is captured from your WhatsApp groups, matched to your project's scope item by item, and backed by its supporting documents (checklists and site photos). Matched work feeds the suggested bill line items; your billing team reviews, adds anything missing and finalises the bill.

StepWhat it does
Import scopeYour project's scope — imported once from your BOQ, work order or contract — so every scope item is available to match against
Capture work doneExecuted work picked up from site updates, including work that isn't on this month's tracker yet, confirmed with the billing engineer
Match it to project scopeWork done matched to the scope item it belongs to, item by item, feeding the suggested bill line items
Substantiate the billChecklists and site photos tracked against every line (Evidence Tracker), with outstanding ones followed up on WhatsApp or email
Finalise the billSuggested bill line items with their supporting documents attached, reviewed and finalised by your billing team

Import scope​

Import your scope once — from your BOQ, billing break-up, work order or contract, during onboarding or whenever it's revised. Velora reads each scope item (description, unit, scoped quantity) so every item is available as a match target the moment field progress comes in.

Scope comes from whichever document defines the work and the lines you bill against: the BOQ on an item-rate contract, the billing break-up on an EPC or lump-sum contract, a work order, or the contract itself. Velora reads the descriptions, units and quantities; it doesn't use rates.


Capture work done​

Every progress update your site teams send on WhatsApp (quantities, progress and photos, by work front) is captured as it happens.

Adding work to this month's tracker: when a field update reports work that isn't on this month's tracker yet, the billing engineer (set during key contact setup) is messaged on WhatsApp with the update and asked to confirm whether to add it, so it goes into this month's bill:

  • Confirm — it joins the tracker like any other line, and follow-ups for its supporting documents start from there.
  • Decline, or no response — it's left out of this month's bill. Nothing is added without confirmation.

Match it to project scope​

Captured work is matched to the scope item it belongs to — not just tallied against a generic activity name — so executed quantity builds up against scoped quantity, item by item, every billing cycle. Matched work feeds the suggested bill line items. Where an update doesn't map cleanly to a single item, it's held for the billing engineer to confirm rather than guessed at silently.


Substantiate the bill​

Each scope item can carry its own supporting-document requirement — a quality checklist, a sign-off, an inspection record, site photos. The Evidence Tracker shows what's been collected and what's still outstanding against every line, so gaps surface before the bill is due rather than on the day.

Follow-ups​

Outstanding checklists and documents are followed up with whoever holds them, on WhatsApp or by email, on a regular cadence until they're received. Less end-of-cycle scramble to track down a missing checklist.

The Billing Manager (set during key contact setup) is copied in as documents come in, and gets a digest of what's still outstanding as the bill cut-off approaches. Documents received against a line update the Evidence Tracker; there's nothing to re-enter.


Finalise the bill​

At bill time, the suggested bill line items (work done matched to scope) come together with the supporting documents collected against each. Your billing engineer or manager reviews them before anything goes out — keying in rates, modifying quantities, including or excluding lines, and putting the bill together however the client requires, whether that's an RA bill, an interim payment application or a progress claim. Velora suggests; the final call on what ships stays with your team.


Common questions​

Is Velora a rate-based billing tool? No. It tracks scoped and executed quantities; your team keys rates into the bill.

Is it only for item-rate (BOQ) contracts? No. Velora works on scope versus executed, and every contract has scoped quantities: in the BOQ on an item-rate contract, and often in a billing break-up on an EPC or lump-sum contract. Either way, work done has to be matched to those lines to raise the monthly bill.


What's next​

  • Field → — where progress, issues, and supporting documents are captured from your WhatsApp groups